工程总结、(Project summary,).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程总结、(Project summary,)

工程总结、(Project summary,) The end of 2011 will be a year, looking forward to the new soon. The XX project from mid April 2011 to the formal construction now, the pipe shop portal steel structure of the total area of 9820 square meters, warehouse reserve portal steel structure a total area of 3840 square meters, the main respectively in early June 2010, mid October 2011 all put into use, all the staff of this companys achievements and correct leadership and project departments hard work is not divided open, we also design engineering department, the Department of materials, such as the company under the unity and cooperation of the results. In the whole construction process of the project, but also a profound understanding of the importance of teamwork, some of their own shortcomings, team harmony and so on are the key factors affecting the smooth progress of the project. Therefore, the engineering work is summarized as follows: A time schedule Project construction period, in the company under the consistent efforts, the overall operation is good, from the engineering safety, quality, progress in all aspects of showing a good trend, but the processing quality of raw materials is an important link, therefore in the material process, the material audit approval related to safety, schedule the major part of. (materials often problems: 1, raw materials and does not match the drawings. Refer to drawing one by one test, to ensure the correct material; secondly, in the processing of raw materials in the production process to intensify the supervision of unnecessary trouble to ensure correct material to ensure good production. 2, raw materials entering the corresponding data is not perfect. In the process of material distribution, organization personnel to prepare the corresponding data with the corresponding data of vehicle allotment. 3, good drawings, common artwork design knowledge may sometimes conflict with the installation of production site, resulting in post site chang

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档