工程测量员-gps外业作业流程(Engineering surveyor -gps external operation process).doc

工程测量员-gps外业作业流程(Engineering surveyor -gps external operation process).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程测量员-gps外业作业流程(Engineering surveyor -gps external operation process)

工程测量员-gps外业作业流程(Engineering surveyor -gps external operation process) Engineering surveyor -GPS field operation process Surveying and Mapping Surveying and mapping instrument equipment business - commerce platform The gold recharge free registration user login and user registration user login registered VIP books The news information software companies offer products supply business recruitment expert Talent Forum blog pages You are at home, this paper, GPS: welcome to visit outside the industry process of Surveying and mapping business channel GPS field operations Author: unknown source: Online Collection Update: 2008 25 March 05 1. network planning and time arrangement: The distribution of GPS network planning and control points, to make the whole network uniform point of error, the best shape of the network according to the distribution of control points of planning: (1) the distribution of control points of the plane: Test area network: the best there are at least three known control points distributed in four quadrant area periphery, if known triangle point (control point) in the test area outside, measuring the distance and the outer zone is known the best not more than 20km. Linear measurement area: the best there are at least three known control points distribution in the test area of the two ends and central, and every 30km has a best known control point. (2) elevation control points distribution: Network survey area: in general, there are 4 known level points as control points in each 10km*10km range of domestic demand, and distributes in the survey area around. If the higher the elevation accuracy, on the number of test area encryption level elevation control points, usually measured with known level are preferably not more than 5km. Linear measurement area: the best there are at least four known control points distribution in the test area of the two ends and central. When the linear measurement area is large, with known level points as control points in

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档