- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程计算规则(Engineering calculation rule)
工程计算规则(Engineering calculation rule)
According to the size and amount of rock engineering calculation allows the overbreak volume in cubic meters.
The width and depth of groove and pit on each side to allow overexcavation quantity: soft rock, hard rock, hard rock: 150mm 200mm
Mechanical removal of concrete barriers were removed by the component volume in cubic meters calculation.
Artificial cut reinforced concrete pile head under pile by the pile head length multiplied by the cross-sectional area of the cut to cubic meter.
Overhead layer: a layer of the frame columns are empty, in the above ground
Sleeper wall: the beam is located in a layer below the surface, and a layer of floor, in order to prevent a layer of ground subsidence
A cast-in-place concrete project is calculated according to the following provisions
1, the volume of concrete works unless otherwise stipulated, according to the icon size entity volume in cubic meters calculation. Do not deduct the steel, embedded iron plate and wall holes in the volume of 0.3 square meters.
2, the foundation: the concrete foundation and the partition wall or column, according to the basis of expanding the top surface is a circle.
The frame type equipment foundation shall be separately according to the foundation, columns, beams and plates corresponding quota calculation. Based on the equipment floor according to beam plate quota calculation.
The basic equipment is not included in the anchor bolt fixed value. The anchor bolt should generally be included in the value of complete sets of equipment, such as the anchor bolts are not included in the value of the value of complete sets of equipment, anchor bolts should be calculated according to the actual weight.
The first order using the strip foundation template at the same cross section, have executed with corresponding basic quota items; without the use of templates and water along the groove strip foundation according to this chapter concrete foundation cushion implementa
您可能关注的文档
- 大学生如何写 简历(How do college students write resumes).doc
- 大学生喜欢追求名牌英语作文(College students like to pursue famous brand English compositions).doc
- 大学生如何培养良好的情绪和情感(How do college students develop good mood and emotion).doc
- 大学生如何度过职业的浮躁期(How do college students spend their career impetuous period).doc
- 大学生如何成为高素质人才(How college students become high-quality talents).doc
- 大学生如何追求入党(How do college students seek to join the party).doc
- 大学生学习计划(Undergraduate learning program).doc
- 大学生学年个人总结(College Students' personal summary).doc
- 大学生安全知识(College students safety knowledge).doc
- 大学生应该如何保持和培养优良的道德品质(How should college students maintain and cultivate good moral character).doc
- 自我介绍食堂卫生管理员 .pdf
- 无机材料科学基础Ⅱ学习通超星期末考试答案章节答案2024年.docx
- 职场通用英语(精品慕课)学习通超星期末考试答案章节答案2024年.docx
- 思想道德与法治(2023-2024-1)学习通超星期末考试答案章节答案2024年.docx
- 算法与程序的奥秘学习通超星期末考试答案章节答案2024年.docx
- 内经选读-64学习通超星期末考试答案章节答案2024年.docx
- 诊断学(18影像、临床、精神、儿科)学习通超星期末考试答案章节答案2024年.docx
- 文化遗产概览学习通超星期末考试答案章节答案2024年.docx
- 铁路线路与站场22级学习通超星期末考试答案章节答案2024年.docx
- 中华传统文化学习通超星期末考试答案章节答案2024年.docx
文档评论(0)