工程计算规则(Engineering calculation rule).doc

工程计算规则(Engineering calculation rule).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程计算规则(Engineering calculation rule)

工程计算规则(Engineering calculation rule) According to the size and amount of rock engineering calculation allows the overbreak volume in cubic meters. The width and depth of groove and pit on each side to allow overexcavation quantity: soft rock, hard rock, hard rock: 150mm 200mm Mechanical removal of concrete barriers were removed by the component volume in cubic meters calculation. Artificial cut reinforced concrete pile head under pile by the pile head length multiplied by the cross-sectional area of the cut to cubic meter. Overhead layer: a layer of the frame columns are empty, in the above ground Sleeper wall: the beam is located in a layer below the surface, and a layer of floor, in order to prevent a layer of ground subsidence A cast-in-place concrete project is calculated according to the following provisions 1, the volume of concrete works unless otherwise stipulated, according to the icon size entity volume in cubic meters calculation. Do not deduct the steel, embedded iron plate and wall holes in the volume of 0.3 square meters. 2, the foundation: the concrete foundation and the partition wall or column, according to the basis of expanding the top surface is a circle. The frame type equipment foundation shall be separately according to the foundation, columns, beams and plates corresponding quota calculation. Based on the equipment floor according to beam plate quota calculation. The basic equipment is not included in the anchor bolt fixed value. The anchor bolt should generally be included in the value of complete sets of equipment, such as the anchor bolts are not included in the value of the value of complete sets of equipment, anchor bolts should be calculated according to the actual weight. The first order using the strip foundation template at the same cross section, have executed with corresponding basic quota items; without the use of templates and water along the groove strip foundation according to this chapter concrete foundation cushion implementa

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档