工程造价学习心得(Project cost learning experience)
工程造价学习心得(Project cost learning experience)
In 1, the flat roof insulation roof exhaust steam hole
2, the staircase in embedded iron
The scaffold with 3, paint, construction
4, precast concrete plate: plate beam head, concrete transportation and installation
5, bored pile drilling into the rock depth (the project of municipal and highway project quota includes a large gap)
6, indoor installation of pipeline purging is easy to miss
7, the high cost of outdoor pipeline installation
8, the installation of the production and material cost angle
The coefficient of 9, spoil the earthwork trench unilateral easy to miss
10, the coefficient of artificial soil forget by Sinotrans
11, cable, wire and so on the list only provide a net amount of engineering, in addition to price group reservation, bending, loss of length
12, easy to leak in the distribution cabinet installation type list steel base
13, water supply and drainage pipeline installation casing leakage list
14, through the wind pipe plugging
15, the valve pressure test tube production and installation of temporary flushing.
16, installation of equipment hoisting equipment amortization.
Bolt 17, pipeline installation in the installation of flange is not materials.
The 18 part: the increase in high-rise buildings and installation fee calculation base consists of 6 layers of 20m or all of the following labor costs. In the high-rise building with high construction conditions, high-rise building and super high fees increase increase fee is the superposition calculation.
19, the ridge line cover! The main components are sporadic!
20, some small, easily missed concrete component;
21, roof grid joints, especially the overhead insulation layer, cement mortar layer dividing joint, but also to do the separation gap on the insulating board;
22, some of the specifications is easy to leak, such as: the wall length of more than 5 meters to construction column, more than 4 meters high wall to add pressure beam;
23, equipment installa
您可能关注的文档
- 大学生学习计划(Undergraduate learning program).doc
- 大学生学年个人总结(College Students' personal summary).doc
- 大学生安全知识(College students safety knowledge).doc
- 大学生应该如何保持和培养优良的道德品质(How should college students maintain and cultivate good moral character).doc
- 大学生应读的书(Books to be read by College Students).doc
- 大学生必看的十大励志书籍(College students must see the ten inspirational books).doc
- 大学生必读文章(College students must read articles).doc
- 大学生人格障碍及完美人格的形成(Personality disorder and formation of perfect personality in College Students).doc
- 大学生抑郁(College Students Depression).doc
- 大学生暑假打工心得(Summer vacation experience for College Students).doc
文档评论(0)