工程造价学习心得(Project cost learning experience).doc

工程造价学习心得(Project cost learning experience).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程造价学习心得(Project cost learning experience)

工程造价学习心得(Project cost learning experience) In 1, the flat roof insulation roof exhaust steam hole 2, the staircase in embedded iron The scaffold with 3, paint, construction 4, precast concrete plate: plate beam head, concrete transportation and installation 5, bored pile drilling into the rock depth (the project of municipal and highway project quota includes a large gap) 6, indoor installation of pipeline purging is easy to miss 7, the high cost of outdoor pipeline installation 8, the installation of the production and material cost angle The coefficient of 9, spoil the earthwork trench unilateral easy to miss 10, the coefficient of artificial soil forget by Sinotrans 11, cable, wire and so on the list only provide a net amount of engineering, in addition to price group reservation, bending, loss of length 12, easy to leak in the distribution cabinet installation type list steel base 13, water supply and drainage pipeline installation casing leakage list 14, through the wind pipe plugging 15, the valve pressure test tube production and installation of temporary flushing. 16, installation of equipment hoisting equipment amortization. Bolt 17, pipeline installation in the installation of flange is not materials. The 18 part: the increase in high-rise buildings and installation fee calculation base consists of 6 layers of 20m or all of the following labor costs. In the high-rise building with high construction conditions, high-rise building and super high fees increase increase fee is the superposition calculation. 19, the ridge line cover! The main components are sporadic! 20, some small, easily missed concrete component; 21, roof grid joints, especially the overhead insulation layer, cement mortar layer dividing joint, but also to do the separation gap on the insulating board; 22, some of the specifications is easy to leak, such as: the wall length of more than 5 meters to construction column, more than 4 meters high wall to add pressure beam; 23, equipment installa

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档