- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
黄河(Yellow River)
黄河(Yellow River)
Interim Measures for the construction and administration of pontoon bridges along the main stream of the Inner Mongolia Autonomous Region, the Yellow River
[release date: 2007-12-16]
general provisions
Article 1
In order to strengthen the construction and management of the Yellow River River Bridge, the river flood control safety and ensure safe operation of bridge, according to the Peoples Republic of China water law, Peoples Republic of China, Peoples Republic of China River flood prevention management regulations and river management within the scope of the construction project management regulations (Ministry of water resources
The former State Planning Commission of No. [1992]7) and other relevant provisions of laws and regulations, combined with the actual development of this approach in our region.
These second measures apply to the construction of the pontoon bridge in the the Yellow River section of the main stream of Inner Mongolia, which belongs to the temporary building within the scope of the river management.
Third article
Autonomous Region Department of water resources, the Union City, county water (water) and flood control departments at all levels of Construction Bureau on the implementation of the supervision and management and demolition. The safety and traffic operation safety of the construction of the pontoon bridge and its guiding way are responsible for the construction unit and management unit of the pontoon bridge.
The second chapter: Declaration and approval of evaluation report of pontoon bridge flood control
The declaration and approval of the fourth bridge flood control assessment reports shall meet the following requirements:
The evaluation report of bridge flood prevention shall be commissioned by the construction unit before the approval of the proposal or pre feasibility study report of the pontoon bridge and the approval of the feasibility study report. In the county, Union City water (water) Preliminary Examinatio
您可能关注的文档
- 视频编辑的一些基本规则(Some basic rules of video editing).doc
- 角游(Angle travel).doc
- 解密盛大管理经(Decrypt the grand management).doc
- 解密跨国公司高管退休计划 注重薪酬绝对值(Decrypt multinational executives retirement plan, pay attention to the absolute value of the pay).doc
- 解析欧神诺时装化经营战略(Oushennuo fashion business strategy analysis).doc
- 裤子制版(Trouser plate making).doc
- 解码即时战略游戏秘笈的分化与进化(图) -(The differentiation and evolution of decoding strategy game tips (Figure) -).doc
- 解析站内优化关键因素(Analysis of key factors in station optimization).doc
- 解读三联集团与国美的上市公司控制权之争 _3491(Interpretation of the dispute over control rights between Sanlian Group and Gome listed companies _3491).doc
- 解读亨达集团的国际化之路(The road of internationalization interpretation of Hengda Group).doc
- 黄老简介2(Huang Lao introduction 2).doc
- 鲁花在这里升华(Luhua here sublimation).doc
- 黄酒企业的三种盈利模式(Three profit models of yellow rice wine enterprises).doc
- 黄酒走向全国的战略失误(The strategic mistake of yellow rice wine going to the whole country).doc
- 黄金交易市场你必须知道的交易手法(The gold trading market you have to know about trading practices).doc
- 麦肯锡思考企业问题的方法(McKinsey's method of thinking about business problems).doc
- 黑客入侵前的信息收集(Information collection before hacking).doc
- 黑客常用手法解密(Hackers often used techniques to decrypt).doc
- 黑客高手眼中安全防范的四大利器(Hackers master eyes four security tools).doc
- 黑格尔唯物辩证法不可或缺的思想环节(Hagel the indispensable ideological link of materialist dialectics).doc
文档评论(0)