公路土方路基施工方法简介(Brief introduction to construction method of highway earthwork Subgrade).docVIP

公路土方路基施工方法简介(Brief introduction to construction method of highway earthwork Subgrade).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公路土方路基施工方法简介(Brief introduction to construction method of highway earthwork Subgrade)

公路土方路基施工方法简介(Brief introduction to construction method of highway earthwork Subgrade) Brief introduction to construction method of highway earthwork Subgrade Author: Laoying The construction of highway earthwork subgrade mainly involves excavation and filling of embankment, treatment of unstable soil, drainage in construction site, side ditch and construction of side slope. Construction methods introduced here are mainly based on construction specifications and acceptance criteria, combined with practical experience in construction, make a general introduction. If there are areas that do not meet the requirements of the code, the standards shall prevail. Site clearance This work includes cleaning, cleaning, removal of topsoil, residue removal and treatment provisions of all vegetation and gravel range, unless some items were retained in place on or in accordance with the specification requirements of the other chapters are not clear. The work also includes the protection of all designated vegetation and substances from damage and destruction. 1 construction requirements: outline (a) the supervising engineer will set the scope of work and specify the retention of various trees, shrubs, plants and other things. The Contractor shall keep all the contents specified. (b) cleaning up, removing debris, and moving trees Not all specified left a variety of surface objects, trees, trees, stumps, roots, roots, and other jungle vegetation, garbage and other prominent obstacles will clean up and excavate the residual root, including the need to save. In the area of road subgrade, if the removal of topsoil and inappropriate material from the region, or a specified compaction, all stumps and roots from the original surface at least 50 centimeters from the bottom and the lower surface layer of at least 50 cm deep in the area of removal. In the road excavation area, all stumps and roots should be removed from the roadbed and no less than 50 centimeters deep below the ground. The pit

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档