公路土方路基施工方法简介(Brief introduction to construction method of highway earthwork Subgrade).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公路土方路基施工方法简介(Brief introduction to construction method of highway earthwork Subgrade)
公路土方路基施工方法简介(Brief introduction to construction method of highway earthwork Subgrade)
Brief introduction to construction method of highway earthwork Subgrade
Author: Laoying
The construction of highway earthwork subgrade mainly involves excavation and filling of embankment, treatment of unstable soil, drainage in construction site, side ditch and construction of side slope. Construction methods introduced here are mainly based on construction specifications and acceptance criteria, combined with practical experience in construction, make a general introduction. If there are areas that do not meet the requirements of the code, the standards shall prevail.
Site clearance
This work includes cleaning, cleaning, removal of topsoil, residue removal and treatment provisions of all vegetation and gravel range, unless some items were retained in place on or in accordance with the specification requirements of the other chapters are not clear. The work also includes the protection of all designated vegetation and substances from damage and destruction.
1 construction requirements:
outline
(a) the supervising engineer will set the scope of work and specify the retention of various trees, shrubs, plants and other things. The Contractor shall keep all the contents specified.
(b) cleaning up, removing debris, and moving trees
Not all specified left a variety of surface objects, trees, trees, stumps, roots, roots, and other jungle vegetation, garbage and other prominent obstacles will clean up and excavate the residual root, including the need to save. In the area of road subgrade, if the removal of topsoil and inappropriate material from the region, or a specified compaction, all stumps and roots from the original surface at least 50 centimeters from the bottom and the lower surface layer of at least 50 cm deep in the area of removal. In the road excavation area, all stumps and roots should be removed from the roadbed and no less than 50 centimeters deep below the ground. The pit
您可能关注的文档
- 伊利的品牌扩张之路从联姻奥运开始(Erie's brand expansion road from marriage to the Olympic Games began).doc
- 优化营销的精准手册 惠通电器厂(Optimization of precision marketing manual Huitong Electrical Appliance Factory).doc
- 优秀投票平台注册地址(Excellent voting platform registered address).doc
- 伊尹书(Yiyinshu).doc
- 优秀教案(Excellent lesson plan).doc
- 优秀生与后进生情况分析(Analysis of excellent students and backward students).doc
- 优秀歌曲(Excellent songs).doc
- 优质强筋小麦(High quality and strong gluten wheat).doc
- 优质网站(Quality website).doc
- 传group管理on积极招募高管 负责海外业务扩张(Pass group management, on actively recruit executives, responsible for overseas business expansion).doc
- 出境宝典2(Exit Book 2).doc
- 出师表方言(Inst of dialect).doc
- 出租房屋管理办法(Measures for the administration of rental housing).doc
- 出经验·出新人·促教改_2390(Be out of experience, new and innovative. _2390).doc
- 出行必停车技巧(Trip parking skills).doc
- 出镜率极高的单词俚语(An extremely high expression of slang words).doc
- 出镜率超高,但你却不太会说的单词.(The rate of appearance is super, but you don't speak very well).doc
- 出镜率超高,但你却不太会说的单词们~~~(High rate words, but you don't speak very well).doc
- 出镜率超高,但你却不太会说的单词们~~(Eyes that are too high, but you don't speak very well).doc
- 出镜率超高的单词(A word with an extremely high rate of appearance).doc
文档评论(0)