Section 3 Sanitary Sewer Laterals (第三节卫生下水道侧根).pdf

Section 3 Sanitary Sewer Laterals (第三节卫生下水道侧根).pdf

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Section 3 Sanitary Sewer Laterals (第三节卫生下水道侧根)

Section 3 Sanitary Sewer Laterals A. General 1. A sanitary sewer lateral is that section of a sanitary sewer that extends from the main sewer to a point 12 inches beyond the right-of-way, curb or sidewalk (or termination point as approved by the Engineer) in front of the property which it serves (refer to Detail 5 – Lateral Connection). 2. Each improved property shall have its own sanitary sewer lateral. Each side of a duplex, or each townhouse unit shall have its own sewer lateral. Buildings incorporating multiple condominium units may be served by one sanitary sewer lateral, similar to an apartment building sewer service. 3. Permits The Applicant shall secure, in the name of the Authority, all permits that are required from the Pennsylvania Department of Environmental Protection (PADEP), Conrail and the Pennsylvania Department of Transportation (PennDOT). The Applicant shall secure, in his own name, all required construction permits such as highway or local street opening permits. Any existing street, highway or other improvements disturbed during construction shall be restored to the satisfaction of the appropriate municipality or Owner before the facilities will be accepted for final acceptance by the Authority. All costs of such permits, including any and all bonds required, shall be the sole expense of the Applicant. 4. Disconnection of Sewer Laterals Disconnection of a sewer lateral shall be done at the sewer main. The 45° bend and the lateral pipe shall be removed and a cap installed on the sanitary tee on the main line. After the cap has been installed, concrete shall be poured over the sanitary tee and cap to prevent future connections at that point. If it is not possible to remove the lateral pipe, and at

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档