option2b–vogtle.ppt

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
option2b–vogtle

Option 2b Template Example Phillip Grissom – Southern Nuclear Based on Vogtle (more or less) 2012-10-19 Plant Information Westinghouse 4-Loop PWR 99.97% Nukon insulation ~ 20 ft3 of Interam fire barrier in ZOI 120 lbs Latent Debris (2x sampled amount) GEH Stacked Disk Strainers 765 ft2 per each of 2 RHR trains , separate CS strainers (2) TSP Buffer GSI-191 Status Strainer Head Loss and In-vessel issues remain open Assuming Original 2007 Bypass Test (193 FA) 111 gm/FA, very conservative but not rev’d by NRC Previous chemical effects testing provided very promising results, but not accepted by NRC Completed Laser scan of entire containment for insulation replacement contingency –both Units Dose = 1083 mrem for 1 unit GSI-191 Closure Decision Essentially 100% Nukon high fiber plant Replace all insulation with RMI implement extensive stringent containment cleanliness program – Option 1 Replace most insulation with RMI, follow PWROG program, additional modification for debris bypass filter, and testing for reduced chemical effects, transport, head loss and bypass – Option 2a or 3 Full Risk Informed (Vogtle and STP are very similar for this issue) - Option 2b GSI-191 Closure Decision – Option 2b Believe we could solve deterministically for Vogtle, but NRC approval and test results have some uncertainty Fully risk informed solution, with ample testing and analysis to get best estimate results is very promising and provides insurance for very low probability event Anticipate re-performing plant specific transport, head loss, bypass and fuel testing for DBE conditions as well as lesser events Planning for modification to add debris bypass filter Key Testing Anticipated Chemical Effects for multiple break sizes and range of important parameters Debris bypass filter – proof of concept testing Strainer bypass – multiple scenarios Strainer head loss – multiple scenarios Debris transport, head loss, strainer bypass at DBE conditions PWROG testing for BAP with fiber, Fuel F

您可能关注的文档

文档评论(0)

wangsux + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档