- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
煤矿地质测量操作规程(Code of practice for coal mine geological survey)
煤矿地质测量操作规程(Code of practice for coal mine geological survey)
Code of practice for coal mine survey workers (1. Theodolite observation)
1, in the handling, measurement, instruments and tools must be properly protected, shall not bump; observation, instrument erection after the station (and mirror station) from the station are not allowed; move, must remove the instrument into the instrument box. If the station is short distance, you can not remove the instrument, but you must embrace the instrument and hold the foot with your hand. Do not jump or run while marching.
2, the measurement of field observation should be selected as a good and clear images of time. Observations should not be carried out at sunrise, sunset and around noon, if the image is blurred or pulsating. Trigonometric leveling also requires a relatively stable time observation of atmospheric refraction.
In 3, high standard construction, and build up observation objects, operating personnel should wear safety belt. Instruments should be taken up and down, effective instruments, boxes and other equipment should be placed firmly, to prevent falling, to ensure that the instrument and personal safety.
4, when observing, according to the following requirements:
(1) instrument rotate smoothly, with vertical wire target sighting telescope, should be placed near the target level according to the observation sequence and wire; observation of other targets. Using the micro spiral or spiral micrometer alignment allowed the goal line, the final rotation should be precession.
(2) every time a goal, not too tight horizontal and vertical screw, micro screw should try to use the middle part.
(3) observation process, sighting level bubble off center shall not exceed the standard, close to a grid, should be measured between re setting instrument.
(4) when the telescope rotation than the observed target, must rotate again after a week a, not the reverse rotation.
(a) surface triangulation and traverse survey precision sh
您可能关注的文档
- 04打造高效执行力组织第三步(04, to build efficient implementation of organizational third steps).doc
- 山地车组装办法(Method for assembling mountain bike).doc
- 山药优质标准化生产周年管理技1(Annual management technique for quality standardization production of Chinese yam 1).doc
- 山建计算机组装与维护 选修课答案- 于宽老师(Answers to optional courses on computer assembly and maintenance).doc
- 1815_1914年欧洲均势关系探析(Analysis of European balance of power in 1815_1914).doc
- 嵌入式填空(Embedded cloze).doc
- 巧借诗词歌赋给宝宝起一个吉祥的名字(Take poetry baby an auspicious name).doc
- 巧克力囊肿不能拖超声引导穿刺法可有效治疗(Chocolate cyst cannot be dragged by ultrasound guided puncture, but it can be treated effectively).doc
- 巧妙面对减肥平台期 解决瘦不下来的困扰(Clever platform to lose weight to solve the problem of thin down).doc
- 嵌入式linux内核编译错误的一些解决办法(Some solutions to compile errors in embedded Linux kernel).doc
- 2023年江苏省镇江市润州区中考生物二模试卷+答案解析.pdf
- 2023年江苏省徐州市邳州市运河中学中考生物二模试卷+答案解析.pdf
- 2023年江苏省苏州市吴中区中考冲刺数学模拟预测卷+答案解析.pdf
- 2023年江苏省南通市崇川区田家炳中学中考数学四模试卷+答案解析.pdf
- 2023年江西省吉安市中考物理模拟试卷(一)+答案解析.pdf
- 2023年江苏省泰州市海陵区九年级(下)中考三模数学试卷+答案解析.pdf
- 2023年江苏省苏州市高新二中中考数学二模试卷+答案解析.pdf
- 2023年江苏省南通市九年级数学中考复习模拟卷+答案解析.pdf
- 2023年江苏省南通市海安市九年级数学模拟卷+答案解析.pdf
- 2023年江苏省泰州市靖江外国语学校中考数学一调试卷+答案解析.pdf
文档评论(0)