牵引变电所检修规程(Code for inspection and repair of traction substation).docVIP

牵引变电所检修规程(Code for inspection and repair of traction substation).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
牵引变电所检修规程(Code for inspection and repair of traction substation)

牵引变电所检修规程(Code for inspection and repair of traction substation) Regulations for the overhaul of traction substations The third chapter handover acceptance After the completion of the eighth traction substation, the project shall be inspected, handed over and checked and short circuit tests of all feeders shall be carried out in accordance with the regulations. 10 days before the handover of the ninth traction substation project, the construction unit shall submit drawings, records, instructions and other completed materials to the operating unit. Tenth traction substation is put into operation. To develop a good mode of operation over the Department, and complete operation and maintenance personnel training, organizational learning and familiar with related equipment, regulations and rules, and pass the examination; prepare for maintenance of tools, materials, spare parts and safety equipment etc.. Eleventh substation put into operation in traction to set up the system and the normal management order; prepare technical documents according to regulations; establish and fill out the original records, files, record, reports etc.. 1. Traction substations shall have the following technical documents: 1., the wiring diagram, indoor and outdoor equipment floor plan, outdoor power distribution device section, protection device schematics, two wiring expansion plans, installation drawings and cable manuals. 2. equipment specifications supplied by the manufacturer. 3. test results of electrical equipment, safety appliances and insulation tools, setting values of protective devices, etc.. Two. The following original records shall be set up at the traction substation on which someone is on duty (see table 1~6 for the format): 1. duty log: the operator shall be responsible for the operation of the traction substation during the shift. 2. equipment defect record: the inspector, the person who found the defect and the person who deals with the defects shall fill in the defects fo

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档