电气倒闸操作票(Electrical switching order)
电气倒闸操作票(Electrical switching order)
Power operation Department 2011 annual contest list of electrical operation tickets
First, operation purpose: to enable #1 UPS system
1. check the #1, standby UPS overhaul all finished, loop integrity can be activated.
2. switch on #1, backup UPS, rectifier power input switch, bypass power input switch.
After 3.1 seconds check that the rectifier is working properly and switch on the #1 standby UPS DC power input switch.
4. press the ON/OFF button, about 40 seconds later, the rectifier and inverter work properly, the battery automatically detects.
5. check the inverter output voltage is normal, close the #1 standby UPS output switch.
6. backup the #1 standby UPS bypass cabinet power supply.
7. cut the #1 standby UPS bypass switch to the automatic position.
8. close #1 machine, reserve UPS bypass cabinet, total power switch Q1.
9. close #1 machine, reserve UPS bypass cabinet and voltage regulator input switch Q3.
10. close #1 machine, reserve UPS bypass cabinet, voltage regulator output switch, Q4.
11. check the #1 standby UPS bypass cabinet work properly.
In 12.2 seconds, press two times B/P INV button, the #1 standby UPS is supplied by main power and cut to the bypass power supply.
13. check the switch to normal, press the B/P INV button, the #2 UPS by cutting back to the main power supply bypass power supply.
14. report: #1 standby UPS is enabled. .
Two, operation purpose: #1 generator group and system coordinate (manual step-up, automatic quasi synchronization, the same period)
1. check the AVR device without alarm and fault information.
2. check the #1 generator up to 3000 revolutions per minute.
3. click the #1 generator group AVR operation, pop-up excitation system operation window.
4. check the #1 AVR adjuster low limit signal with indication.
5. cut the #1 AVR regulator mode switch to manual mode.
6. press the reset button, click AVR excitation input, check AVR excitation input turn red.
7. check the #1 magnetic field switc
您可能关注的文档
- 现代分子生物学第三章课后答案(The third chapter of modern molecular biology).doc
- 现代化工杂志格式(Journal of modern chemical engineering).doc
- 现代唯美说《梁祝》双双飞过万世千生去(The modern aesthetic said the Butterfly Lovers both over thousands of life to Jesus Christ).doc
- 现代史中日关系揭秘(节选)(Secrets of Sino Japanese relations in modern history (excerpt)).doc
- 环境速测箱使用说明书(Manual of environmental test kit).doc
- 环氧增塑剂(Epoxy plasticizer).doc
- 现代大学英语听力1(Modern college English Listening 1).doc
- 现代教育原理任务4(The task of modern education principle 4).doc
- 现代文学三十年重难点(The thirty years of modern literature are difficult and difficult).doc
- 环孢菌素a联合血浆置换治疗急性重症狼疮肾炎(Cyclosporine a combined plasma exchange in the treatment of acute severe lupus nephritis).doc
最近下载
- 风力发电机模拟软件:FAST二次开发_(3).FAST模拟器架构解析.docx VIP
- 语文三年级下册专项训练:阅读.doc VIP
- 金属制品项目企业经营战略方案.docx
- 人工智能导论课件 第十三章 类脑智能.pptx VIP
- 招聘面试题大全.doc VIP
- 北师大版小学数学六年级下册各单元思维导图.pdf
- 中考物理常考估测汇总及估测训练100题(模拟50题+真题50题)(原卷版).docx VIP
- 岩壁梁悬臂模板施工方案.docx VIP
- 碳纤维片材加固混凝土结构技术规程(2007年版) CECS146:2003.pdf VIP
- 新人教版(2025)小学三年级英语下册第六单元Unit 6 单元整体教学设计.docx VIP
文档评论(0)