The Performance Prediction of A TBM in Difficult (性能预测TBM的困难).pdfVIP

  • 3
  • 0
  • 约3.24万字
  • 约 12页
  • 2017-09-03 发布于浙江
  • 举报

The Performance Prediction of A TBM in Difficult (性能预测TBM的困难).pdf

The Performance Prediction of A TBM in Difficult (性能预测TBM的困难)

The Performance Prediction of A TBM in Difficult Ground Condition Nuh BİLGİN, Cemal BALCI, Hakan TUNÇDEMİR, Şinasi ESKİKAYA Department of Mining Engineering, Technical University of İstanbul, Turkey. Mustafa AKGÜL, Melih ALGAN STFA Construction Company, Turkey. ABSTRACT: Tuzla-Dragos Sewerage Tunnel is situated in the Asian Side of Istanbul. A detailed laboratory full-scale cutting tests were used on rock samples collected from tunnel side. The equipment used for the tests is developed under NATO TU-Excava

文档评论(0)

1亿VIP精品文档

相关文档