- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Time Effects on The Bearing Capacity of Driven (时间对承载力的影响)
Time Effects on The Bearing Capacity of Driven Piles
C.S. Chen, S.S. Liew Y.C. Tan
SSP Geotechnics Sdn Bhd, Malaysia
ABSTRACT: Two case histories where the changes in pile capacity were observed with time are presented. The first case shows the
increase in pile capacity especially the shaft friction for piles driven into clayey deposit. The average unit shaft friction, determined
from the high strain dynamic pile test, has increased from 33 kPa to 57 kPa from 3 days to 33 days after the installation of piles.
The second case shows a tendency of increase in pile capacity for pile driven into sandy deposit over a period longer than needed for
complete dissipation of excess pore water pressure induced by the driving process.
1 INTRODUCTION Beyond this transition zone, the soil remains its original
properties. The driving of pile sets up high pore water pressure
The geotechnical capacity of pile is normally estimated by static in the remolded zone. The water flows away from the pile
pile formulas and later confirmed by pile load test. Very often surface and the remolded zone is re-consolidated. This re-
the pile load test was carried out shortly after the installation of consolidation process can lead to higher undrained shear
pile. The pile capacity obtained from the load test is often strength and give higher pile capacity. In some cases, the
assumed to be the long term pile capacity. However, during the remolded zone which is of higher strength than the surrounding
pile driving process, soils which surround the pile shaft and soil will adhere
您可能关注的文档
- This PDF is a selection from a published volume …(这个PDF是一个选择从出版卷u2026).pdf
- thermochemistry exercises answers Bing(热化学练习答案必应).pdf
- THIS PDF IS A SAMPLE OF THE 2016 TREND (这个PDF是一个样本的2016的趋势).pdf
- This practice book contains PHYSICS TEST(这本书包含了物理考试练习).pdf
- This publication is not intended for distribution (这个出版不是用于分布).pdf
- This sample chapter is for review purposes only. (这个示例章仅供审查的目的。).pdf
- This section on the installation of isprovided on (本节isprovided的安装上).pdf
- This sample chapter is for review purposes only. …(这个示例章仅供审查的目的。).pdf
- This tool was developed at RAND Health as part (这个工具是兰德健康作为开发的).pdf
- This text was adapted by The Saylor Foundation (本文是由塞勒基金会改编的).docx
- Time Delay Integration (TDI) , The Answer to (时间延迟积分(TDI)的答案).pdf
- Time Machine TG Penguin Books(时间机器TG企鹅出版社).pdf
- Time Domain Response of Multidegreeof (Multidegreeof的时域响应).pdf
- Time Series Princeton University(时间序列普林斯顿大学).pdf
- Time Management Best Practices for Sales (时间管理的最佳实践销售).pdf
- Time Series Analysis of Household Electric (时间序列分析的家用电器).pdf
- Time Series Analysis with R University of (时间序列分析与R大学).pdf
- Time series feature extraction for data mining …(时间序列特征提取的数据挖掘u2026).pdf
- Time Series Analysis UPM(时间序列分析芬欧蓝).pdf
- Time series Forecasting using HoltWinters (使用HoltWinters时间序列预测).pdf
文档评论(0)