- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2013 sewage treatment plant internship experience(2013年污水处理厂实习经验)
2013 sewage treatment plant internship experience
Write papers network: 2, process control
The central control room The whole plant mainly run equipment monitoring and control in the control room simulation screen can display the dynamic of the whole plant running and running parameters. Control system computer interface clear, simple to operate, with operation of the display, historical curve display, fault display, data table display and date , month, year reporting capabilities.
Quality measures are effective to ensure the quality of the project, we measured the amount of real and quality assessment of the sub-project of the unit project in a timely manner, the unit project quality have reached an excellent level of standard.
(A grill
Role: large residue intercept sewage to ensure the normal operation of the pump, and to meet the need for follow-up treatment.
Equipment: 2 sets of mechanical grille, conveyor, stainless steel light valve 6.
Process parameters: pitch: 20mm, mounting angle: 75 ? the maximum total flow over the wa ter: 4.042 m3 / s.
(B enhance the pumping station
Role: to raise the height of the upper reaches to the desired height of the post-processing, to gravity.
Equipment: vertical centrifugal pump 6
Process parameters: a single-pump design flow: 3100 m3 / h Motor Power: 28kw
(Three or four conjoined (fine grid, blower room, aerated grit chamber, pasteurized metering tank
Role: Clear the small sewage sludge, the sewage aeration tank swirl, organic matter washed into the sand attached to the surface of the water, the sand precipitation last measured water.
Equipment: ladder grill machine 2 sets, sand and water separator, blower, sand suction machine 2.
Process parameters: aeration rate of 0.1 cubic meters of oxygen / cubic meters of sewage
Grille pitch: 6mm, effective depth, 2.5m, residence time: 1.68h
(Siping flow sedimentation tank
Role: by gravity sedimentation, removal of sewage density th
您可能关注的文档
- 13 years winning branded content marketing ten ways(13年赢得品牌内容营销十个方法).doc
- 148 cases of birth defects in children Survey and Analysis(148例儿童出生缺陷调查和分析).doc
- 132 cases of blunt liver injury clinic Analysis(132例钝肝损伤临床分析).doc
- 146 Cases on Chinese medicine transdermal delivery of adjuvant therapy in children with bronchial pneumonia(146例中药辅助治疗的皮肤交付在儿童支气管肺炎).doc
- 15 cases of burn wound vacuum-assisted closure adjuvant treatment of deep electric(15例烧伤伤口深电真空辅助闭合辅助治疗).doc
- 156 cases of perioperative nursing serious ankle injury(156例围手术期护理脚踝严重受伤).doc
- 16 characters to decrypt the first brand promotion tips(16个字符来解密第一品牌推广技巧).doc
- 160 cases of surgical wound infection Clinical Analysis of the pathogen distribution and drug resistance(外科伤口感染160例临床分析病原体的分布和耐药性).doc
- 162 cases of long-term efficacy of percutaneous ozone ablation of lumbar disc(162例长期疗效的经皮腰椎椎间盘臭氧消融).doc
- 175-year-old Procter & Gamble to Draw Digital Marketing in China cloud images(175岁的宝洁,).doc
- springbooot+vue基于java的房屋维修系统毕业论文.doc
- 中国消防救援学院《单片机系统实验》2023-2024学年第一学期期末试卷.doc
- 2025年溧阳纺织化学品项目申请.pptx
- 景区门票包销合同模板(3篇).docx
- 【股票技术指标学习指南】第七章第三节货币需要量的测算.doc
- 2025春 _ 人教版七年级英语下册【unit4】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit5】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit6】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit7】看音标写单词.doc
- 2025春 _ 人教版七年级英语下册【unit8】看音标写单词.doc
文档评论(0)