2014 automation internship summary(2014年自动化实习总结).docVIP

2014 automation internship summary(2014年自动化实习总结).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2014 automation internship summary(2014年自动化实习总结)

2014 automation internship summary Three-month internship unknowingly passed, moving to and fro from the beginning of the chaos, to today’s smug, high morale, experienced a lot, feeling it a lot. Xx first came on the first day, I was involved in Shanghai xx fourth, five sets of noise walls assembly work projects, and several trips to Shanghai for a client installation and commissioning of the equipment. Then immediately began its sixth Seven sets of noise walls assembly projects. several trips to Shanghai also soundproof wall series of mop-up and improvement projects. During this period, I was also involved in the assembly and commissioning Shanghai xx rotating car. Appeared in a variety of different situations at work, such as locating holes in the wrong, the deviation of the workpiece size, parts assembly interfere, but eventually united in our colleagues Under the third, to overcome difficulties and solve problems, complete assembly and commissioning car. complete this project on my mechanical assembly knowledge, ability, fitter operation has greatly improved. June 8 start, I participated in the work of Liu workers assembling designed without 锡艾诺 the stator winding machine. Acceptance process in several projects, the client repeatedly proposed rectification. We follow customer needs, meet their requirements, continuous improvement of equipment, the winding machine operation more convenient, easier and significantly improve the efficiency of the winding, winding machine function more perfect. June 12, the company received Zhenjiang A Raymond project, I participated in the project plan will be discussed fully experience the company to do the program of intense seriousness, but methodical kind of atmosphere, the company gained a deeper understanding of culture. June 20, I participated in the design of the American Mercury project, assigned to the engine fluid seal test fixture program part in the strong support and encouragement Yao workers, Liu Yo

文档评论(0)

ctuorn0371 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档