xx座主机吊缸检修(Repair of XX block main engine suspension cylinder).doc

xx座主机吊缸检修(Repair of XX block main engine suspension cylinder).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
xx座主机吊缸检修(Repair of XX block main engine suspension cylinder)

xx座主机吊缸检修(Repair of XX block main engine suspension cylinder) The so-called host suspension cylinder overhaul is to remove the cylinder head, transfer piston assembly, cylinder head, air valve, piston assembly, such as inspection, measurement and repair. The specific procedures are as follows: First, the preparatory work (1) the chief engineer has made arrangements for the task of hanging cylinders, and the need to prepare them for implementation, and stresses the importance of safety. (2) preparation requires tools, gauges, materials, spare parts. (3) check lifting tools, such as driving, hoist, chain, wire rope, hanging piston professional sling, to ensure safety and reliability. (4) check the main starting valve and air bottle outlet valve is closed, close the control air, safe air, exhaust valve drive air, drain the air in the pipe. (5) close the fresh water inlet and outlet valve of each cylinder, release some of the fresh water, stop the lubricating oil pump, fuel pump, and close the fuel inlet valve. (6) check whether the indicator valve of each cylinder is opened. (7) check whether on turning gear. (8) on the control board, the sign indicating that the vehicle is being checked and not allowed to move is being hung. Two, cylinder head hanging out and inspection (1) the head of the pipe and the connection removal mechanism, such as the burning of the tubing, hydraulic exhaust mechanism (oil), air pipe, water pipe, exhaust pipe, mark cloth. (2) confirm the pipeline and tubing have been removed after the cylinder head, can release the special hydraulic cylinder head nut (hydraulic pressure, remove the 900-990bar) and then hand unscrew cylinder head nut, remove the nuts and washers are properly placed. (3) lift the cylinder head with a special cylinder head sling. (4) check the joint surface at the bottom of the cylinder cover. (5) check whether the cylinder cover is cracked or not. (6) check the exhaust valve, valve seat and so on. (7) check the cooling water ca

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档