- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
喷灌规范(Sprinkler regulation)
喷灌规范(Sprinkler regulation)
General construction code for sprinkling irrigation on golf courses
--------------------------------------------------------------------------------
Source: Golf construction maintenance network 2010-4-29 popularity: 486
Chapter 1: special conditions
1-01 completion time
The completion time of all work terms included in this specification shall be related to the progress plan for the golf course construction. See paragraph 2.06.
1-02 contractors modifications to drawings and specifications
Without the written approval of the designer, the Contractor shall not make any changes to the specifications and drawings.
1-03 changes, changes, deletes, and increases in work
At any stage of the work, the designer shall have the right to make any changes, deletion and addition to the work included in the drawings and specifications. In this regard, the package may not be any different, and can not affect the completion time of the project, unless the designers consent.
If the design changes involve additional mechanical or artificial, B should be in good coordination costs of providing the required equipment and labor.
All agreements to be changed, deleted or added to the work shall be in writing and recognized by the designer.
1-04 material
Unless otherwise specified, the materials used as permanent use must be new, quality first class materials and conform to the specific specifications of the following specifications.
1-05 protection of existing structures and facilities
Contractors should be careful to avoid construction of existing facilities, structures, archaeological sites, as well as ground and underground facilities in the owners property. The structural location shown on the drawings is familiar to both the owner and the designer, and the drawings are made on the basis of the best information available. Contractors should do their best to preserve the natural landscape, including trees and natural areas.
1-06
All materials must be piled up
您可能关注的文档
- 使用设计模式构建通用数据库访问类_c#(Using design patterns to build generic database access classes _c#).doc
- 使用qt 开发一个屏幕录像程序(Using QT to develop a screen recording program).doc
- 使辽语录 宋·陈襄(Song quotations by Liao Song Chen Xiang).doc
- 信息学奥赛分区联赛复赛经验漫谈(Information science, Orsay, divisional League, semi-finals, experience).doc
- 修复硬盘坏道竟如此简单(Repair the hard disk so simple).doc
- 修改gho文件,打造自己的ghost(Modify the GHO file to build your own ghost).doc
- 使用注册表导入快速关闭无用的服务(Use registry import to quickly close unused services).doc
- 倾听——职场晋升管理的阶梯(Listening -- the ladder of career promotion management).doc
- 偏执人格心理障碍(Paranoid personality disorder).doc
- 做一个电脑游戏策划师(Be a computer game planner).doc
- 嘶吼(swing).doc
- 四六级冲刺700核心词(46 sprint, 700 core words).doc
- 商法》名词解释集锦(Interpretation of the term commercial law).doc
- 四六级必考的一百个短语(One hundred grade 46 compulsory phrases).doc
- 四川名景点门票、(Tickets for famous scenic spots in Sichuan,).doc
- 四川商务职业学院(Sichaun Business Vocational College).doc
- 四川文理学院专业技术岗岗位职责(Sichuan University of Arts and Science technical post responsibilities).doc
- 商界不倒翁演绎致富神话(图)(A business interpretation of rich mythology (Figure)).doc
- 四六级完形填空技巧(46 level cloze skills).doc
- 四川省自贡市2012-2013学年七年级历史上学期期中试题(答案不全) 新人教版(Zigong, Sichuan, 2012-2013 year history, grade seven, history, midterm questions (incomplete answer), New Education Edition).doc
文档评论(0)