analysis of the hydraulic cement mixing pile construction quality control points(分析液压水泥搅拌桩施工质量控制点).doc

analysis of the hydraulic cement mixing pile construction quality control points(分析液压水泥搅拌桩施工质量控制点).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
analysis of the hydraulic cement mixing pile construction quality control points(分析液压水泥搅拌桩施工质量控制点)

Analysis of the hydraulic cement mixing pile construction quality control points Paper Keywords: hydraulic cement mixing pile method of construction quality control Abstract: cement mixing pile large, wide, and is hidden project, the construction is difficult to accurately control the quality of the cement mixing pile, so engineering examples, the article prior to the construction of the cement mixing pile, the quality of the construction process control points are discussed, and the actual cement mixing pile construction project after quality testing to ensure the safety and reliability. With the development of science and technology, cement mixing pile technology has been widely used. Cement mixing pile is the use of cement as a curing agent of the pile, with a special drill bit through the deep-mixing machinery in place the foundations deep soft soil and curing agent forced mixing, so that a range of soft soil induration and improve overall foundation of the composite strength of this method is suitable for treatment of soft soil, a significant treatment effect, especially when dealing with Water Resources and Hydropower Engineering reinforcement saturated soft clay foundation can be treated quickly put into use How to effectively control the deep cement mixing pile into the pile quality and ensure the effect of soft ground in engineering practice is to explore a topic. 1 Project Overview A Water Supply Project reservoir ancillary works, such as V, the main buildings of five, according to a case against the equivalent of 10 a design of flood defenses. Revetment wall using reinforced concrete buttress structure, the average wall height 10.60 m. revetment wall foundation soil engineering geological characteristics: according to the causes of rock layers to form a layer of rock composition, particle size, deposition rhythm and plasticity index, within the control of the drilling, the foundation soil is divided into six levels, from top to botto

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档