analysis of the quality of electrical engineering problems and countermeasures(电气工程的质量问题的分析和对策).doc
- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
analysis of the quality of electrical engineering problems and countermeasures(电气工程的质量问题的分析和对策)
Analysis of the quality of electrical engineering problems and countermeasures
2.4 Ground Lightning deal Through reinforcement of the foundation slab, columns and floor reinforcement welding, corrosion, ground resistance testing to do and whether it meets the specifications and design drawings if necessary increase the artificial grounding to reduce grounding resistance value to connect the ground wire, ground terminal of the reserve should be consistent with regulatory requirements, exterior doors and windows of metal, the metal protective railings and roof large part of the mine as a key, to improve convergence process, to prevent the omission, ground equipment enclosure should be improved, when using the column bars do lead off-line, you must have a top-down reinforcement deflectors mark, when using special deflectors, attention should be up and down through into one, and do welding, anti-corrosion treatment.
2.5 hidden control works In electrical engineering the construction process, there are a lot of cable management, grounding wire must pass through floors, walls, or other buildings, and buildings will have ground floor flat steel, basic channel, such as welding and if wrong, not only rework difficulties, but also lay hidden, it must strictly monitor the quality of hidden works. embedded pipe material type specifications meet the design requirements, the tube is arranged in neat, bend radius compliance with regulatory requirements. cable, bus model specifications meet the design requirements , power cables, control cables are laid separately, shielded cable is required, compliance with national installation standards. to prevent the embedded tube is blocked, ground wire and cable is damaged during the construction process in the construction, supervision and site inspections to be used, on-site observation, measurement and inspection records to ensure construction quality installation. Measuring ground resistance should be less than equal to th
您可能关注的文档
- analysis of the musical way finding(音乐的分析方法发现).doc
- analysis of the money supply impact on the cpi and gdp(分析货币供应量对cpi和gdp的影响).doc
- analysis of the mutual aid county water management(互助县水资源管理的分析).doc
- analysis of the national area community education and cultural inheritance(分析民族地区社区教育和文化遗产).doc
- analysis of the national defense education association in the college(分析国防教育协会的大学).doc
- analysis of the national matriculation english chapter teaching(分析全国入学考试英语篇章教学).doc
- analysis of the national model of vocational training colleges production bases(分析国家职业培训学院生产基地的模式).doc
- analysis of the nature of the legal aid(法律援助的性质的分析).doc
- analysis of the nature of trademark rights and alienation(分析商标权和异化的本质).doc
- analysis of the need to build deferred prosecution(分析需要建立暂缓起诉).doc
最近下载
- 最新最完整的的厂房设施确认实施方案.pdf
- 工程造价专业大学生职业生涯规划书.docx VIP
- 档案管理10号令解读(网).ppt
- 重庆《轻质隔墙条板应用技术标准》DBJ50T 338-2019.pdf
- (冀人版)科学五年级上册全册知识点.docx
- 电子工业版信息科技七年级上册3-1 “互联网+”在学习中的应用 教案.pdf VIP
- 2024-2025学年高中生物 第4章 种群和群落 第4节 群落的演替说课稿 新人教版必修3.docx
- 10 数学史问题与一元一次方程(含答案析) -七年级数学之专攻一元一次方程各种类型题的解法(人教版).docx
- 锅炉本体焊接作业指导书.pdf
- 钣金加工:折弯工艺手册.doc VIP
文档评论(0)