analysis of the water projects construction cost control measures analysis of(分析水利工程的施工成本控制措施的分析).docVIP

analysis of the water projects construction cost control measures analysis of(分析水利工程的施工成本控制措施的分析).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
analysis of the water projects construction cost control measures analysis of(分析水利工程的施工成本控制措施的分析)

Analysis of the water project’s construction cost control measures Analysis of [Paper Keywords] water conservancy project cost control measures [Abstract] water project cost control is a long-term, dynamic work, including a number of areas, so to strengthen the water conservancy project construction cost control, all aspects of the work must be done, must deal with all aspects of the relationship In this paper, mainly from the project cost control problems, discusses strengthening project cost control initiatives. In recent years, water conservancy construction has made great achievements but there are many problems, especially the cost of the project cost has been the hot issue of concern below the construction cost to analyze a number of problems, propose solutions to the measures. A water conservancy project construction cost control overview Water project cost control mainly for investment decision-making phase, design phase, construction and implementation of cost control, the construction project cost control in place within the approved cost limit, and at any time to correct the deviation occurred, to ensure that project cost management and investment goals. conservancy construction projects in the rational use of human, material and financial resources to achieve better in all aspects of investment and social benefits, it must be scientific and reasonable cost of water projects to control. China’s current water project cost are: equipment and engineering, construction and installation costs, temporary construction costs, equipment purchase costs, reserve fund, other fees range construction, engineering construction loan interest, etc. In addition, water conservancy project is a long-term its cost control throughout the project. Once established the project plan, in accordance with the inherent process into the preliminary design stage, preliminary design is completed, go to the construction design phase until completion and

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档