2011新运规(2011 New Rules).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2011新运规(2011 New Rules)

2011新运规(2011 New Rules) 2011 New transport regulation questions First, fill in the blanks: 1, according to the rules of railway transport and railway wagon technical management regulations (Professional) the relevant requirements of technology management, formulate the rules. 2, the use of vehicles in accordance with the responsibility, leadership responsibility, professional, responsible, responsible for the job (Division) requirements, the implementation of strict (Management) and evaluation mechanism, enhance the management level of freight car operation, ensure the safety of transportation. 3, the use of vehicles workshop is responsible for railway freight safety prevention system (Management) work station. 4, dynamic scene examiner, the examiner, the examiner, check out the duty train inspection foreman production line and other personnel shall have the railway freight car use and the basic knowledge (skill), the (qualifications) training and skill appraisal (exam qualification certificates). 5, the use of vehicles used in workplaces is a unit of production qualification accessories manufacturing or repair (repair), and in accordance with the above criteria, and the (inspection) qualified, valid in accordance with the provisions of the product. 6, train inspection team of the field can be divided into operation group (dynamic inspection group), operation group, (in failure group). Working group should be based on making train diagram (technical operations of trains plan) and stage need to set up a reasonable transportation organization. 7, where the provisions of standards and methods of Railway Bureau set up, shall (below) the rules (the corresponding technical standards and requirements, to ensure the safety of transportation). 8, the existing lines and lines of newly built or rebuilt, according to the needs of railway freight transport organization and operation safety, set up truck operations use field and (railway security system). 9, (hot rolling bearing

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档