kailufangan(kailufangan).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
kailufangan(kailufangan)

kailufangan(kailufangan) In scheme Furnace construction will be completed, the production will be the primary task, especially in work is more important. In general is divided into two stages, one is the baking and roasting electrode, two feed production of qualified products. The purpose of the oven is to remove the moisture and gas in the lining; to roast the electrode; to make the lining to accumulate enough heat to achieve the better thermal stability of the furnace; to meet the requirements of smelting. Oven and baking electrode In order to speed up the baking process and reduce the cost of baking, the oven and the baking electrode are simultaneously carried out by adopting an electric baking furnace. 1, the first comprehensive examination of various equipment complies with the test requirements: power supply system, electric control system (busbar system, instrument and meter, PLC), water cooling system, electrode control system, electrode pressure system, suspension system, electrode with insulation system, feeding system, gas purification system, furnace system, calcium carbide crushing system. 2, after the equipment inspection normal, makes the electric stove transformer no-load 24 hr. 3. Charging: 1) in the bottom of the three-phase electrode is lower for? 1500 x 1200 x 6 mm coke drum Zhuru shown in figure -1, with 5 ~ 30 mm Lantan?. 2) as shown in figure -2 production of calcium carbide and masonry bottom channel false door (its main strong guarantee in the start-up period does not collapse, no leakage). Material: ordinary building brick 700;? 1500 to 250 mm (6 log root length of 1300 and 2600 mm and three root). 3) with charge: first in the bottom filling? 5 ~ 30 mm Lantan, thickness of 200 mm (about 6 tons); then according to the normal charge (Figure -1 filling materials according to laboratory ingredients). 4) with a grain size less than in the three-phase electrode shell? 100 mm qualified electrode paste, its height is decreased when the electrode to

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档