on strengthening the electrical engineering quality control and safety management measures(关于加强电气工程质量控制和安全管理措施).docVIP

on strengthening the electrical engineering quality control and safety management measures(关于加强电气工程质量控制和安全管理措施).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
on strengthening the electrical engineering quality control and safety management measures(关于加强电气工程质量控制和安全管理措施)

On strengthening the electrical engineering quality control and safety management measures Abstract: The construction and installation works, often there will be this kind of quality problems, how to prevent common problems such as cracking and leaking, how to improve the intelligent building electrical construction management and quality control is the electrical engineer should pay attention to. Keywords: electrical construction, management control, measures (an electrical engineering construction safety construction and installation works, often there will be such as quality problems, how to prevent common problems such as cracking and leaking, construction and installation of quality control is the construction a key link in the practical work, on the one hand from the perspective of improving technology to reduce the quality problems, but also from a management point of view the other as much as possible to avoid accidents, are combined with work experience, elaborate on how to strengthen the building installation of quality control in the project pre-construction, electrical installation and technical personnel should be familiar with the electrical construction drawings and technical staff in conjunction with civil construction civil engineering construction plans and checking electrical drawings, some of which are cross-listed construction, according to civil construction schedule, based on the embedded steel, hangers and line protection tube embedded in the other, discharged with cross the construction plans to determine the accuracy with time, to prevent omissions and errors occur. co-exist with the construction will be preceded by a variety of pre- embedded parts of the production is good, and make the necessary anti-corrosion treatment, to do pre-construction techniques and materials preparation, in electrical engineering operations, operation sequence reversed or missing, can lead to casualties, equipment damage, blackouts, etc. serious accident

您可能关注的文档

文档评论(0)

wnqwwy20 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档