六段咨询之企业插件式管理(十一)(Six step enterprise plug-in management (eleven)).docVIP

六段咨询之企业插件式管理(十一)(Six step enterprise plug-in management (eleven)).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
六段咨询之企业插件式管理(十一)(Six step enterprise plug-in management (eleven))

六段咨询之企业插件式管理(十一)(Six step enterprise plug-in management (eleven)) 1. point method for plug-in 1) power system and cooperative system each plug-in point The above plug-in feature point set, analysis and discussion are obtained in the viewpoint of system and universal relation viewpoint, spiral viewpoint and development viewpoint, the viewpoint of contradiction are fundamental philosophy and enterprise management of the professional judgment on the characteristics of the system function. In the specific work, when many enterprises encounter each other and involved, but do not know how to find a breakthrough, do not know where to start, do not know how to carry out the work, we give the following methods to assess the problems faced, and find out the first problem to be solved and carried out work. We assessed by the scoring method, specific methods are listed in the following table: In the table, scoring for the 5 plug-in features of each problem, each plugin feature scores 1-10 points, and the scoring for node negative points (because the node is larger, more to work is not to carry out), put the sum of scores of all the characteristics of each plug-in draw together according to the score, score to determine the size of each plug-in points ranked second, the higher the score, the more should be as the preferred plug point. 2) for power system and cooperative system plug-in balance point How to find a balance of power system and cooperative system. 2. plug-in collaboration system construction example 1) functional requirements, the enterprise collaboration system in material procurement, manufacturing, marketing, technology research and development as the main body, in order to ensure the enterprise to gain market recognition and to ensure sustained profitability, must achieve the following functions: ? the product cost is low, which is determined by the purchase cost of low production cost, no waste and high management efficiency (decision speed, no extra work), deci

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档