厨房设备施工工艺(Kitchen equipment construction technology).docVIP

厨房设备施工工艺(Kitchen equipment construction technology).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
厨房设备施工工艺(Kitchen equipment construction technology)

厨房设备施工工艺(Kitchen equipment construction technology) The construction technology of kitchen equipment Date of release: 2010-11-16 classification: the decoration process Kitchen equipment installation (a) the construction process Wall and floor base treatment, install the product inspection and installation to install bottom cabinet to connect the cabinet for water supply and drainage installation, debugging, testing and adjustment of electrical equipment cleaning. (two) construction essentials Inspection prior to the installation of kitchen equipment. The cabinet should be installed according to different wall using different fixation methods. The bottom cabinet should be installed before adjusting the level knob, ensure the cabinet table, the front face in a horizontal plane, two cabinet connected using wood screws, the back plate through the pipeline, meter and valve etc. should be crossed back drilling. Install the washing cabinet floor water hole with plastic circular pad, sewer connections should be guaranteed, Water Leakage watertight, shall not use all kinds of adhesive connection. The installation of stainless steel sink, ensure uniform flume and table connection gap, no leakage. Install the faucet, installation firm, Sheung Shui connection cannot appear leakages. Smoke lampblack machine installation, pay attention to cooperate with condole extractor hood size should be coordinately. Install the stove, there shall be no leakage phenomenon, using soap to test whether the installation intact after installation The principle of indoor gas pipeline installation Indoor gas pipe should be laid. The gas pipeline shall be non combustible material along the wall laying, when meet with other pipes, should meet the following requirements: (1) the level of parallel, net distance not less than 150mm; (2) vertical parallel, spacing should not be less than 100mm, and should be located outside the other pipeline; (3) cross laying, spacing should not be less than 50mm. Distan

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档