吊顶施工(Ceiling construction).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
吊顶施工(Ceiling construction)

吊顶施工(Ceiling construction) 6 ceiling Engineering 6.1 general provisions This chapter applies 6.1.1 quality inspection to the dark ceiling, the ceiling a project. Explain: 6.1.1 this chapter applies to the keel with the decorative panel of the ceiling project. According to the different construction process, and dark keel and keel ceiling. 6.1.2 ceiling project acceptance should examine the following documents and records: 1 ceiling engineering drawings, design specifications and other design documents. 2 Certificate of material products, performance test reports, site acceptance record and retest report. 3 concealed engineering acceptance record. 4 construction record. The formaldehyde content of wood-based panel with 6.1.3 ceiling engineering for re inspection. 6.1.4 ceiling project to deal with the following hidden project acceptance: 1 ceiling installation and water piping and equipment pressure test. 2 wooden keel fire prevention, anti-corrosion treatment. 3 or embedded parts of tie bar. 4 rod installation. 5 keel installation. 6 filling material is provided. Explain: 6.1.4 in order to ensure the safe use of ceiling engineering, and ensure the completion acceptance without damaging the finish, concealed engineering acceptance of ceiling engineering is very important, this article listed sections shall be provided by the record concealed engineering acceptance of supervision engineer signature. 6.1.5 sub project inspection group should be classified according to the following provisions: The same kind of ceiling project each of the 50 rooms (large rooms and corridors in area 30m2 is a ceiling) should be divided into a test group, less than 50 also should be divided into a test group. 6.1.6 check number shall comply with the following provisions: Each test should be at least 10% batches of checks, and shall not be less than 3; under 3 should be fully checked. 6.1.7 installed before the keel, should according to design requirements of the room, the elevation and th

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档