住宅工程关键部位防渗漏控制措施(Leakage control measures for key parts of residential engineering).docVIP

住宅工程关键部位防渗漏控制措施(Leakage control measures for key parts of residential engineering).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
住宅工程关键部位防渗漏控制措施(Leakage control measures for key parts of residential engineering)

住宅工程关键部位防渗漏控制措施(Leakage control measures for key parts of residential engineering) The holes around the window frame shall be A cap or a plastic cap covered and sealed with sealant. Exterior window section is joined and tight The bolt holes are also sealed with sealant. The opening of the window frame shall be provided with a drain hole to ensure that the drain hole is opened In rainy days, the sill will not leak because of water. . (3) control the quality of key processes. The filling and closing between the window frame and the opening is Critical work must be strictly controlled quality. The foaming agent may not have full or leakage. Outside the window After installation, all inspection and sampling shall be carried out according to specifications and spray test shall be carried out, If it is found that the inner wall of the window has seepage or leakage, it must be analyzed in time Due to organize special repair. . 3.4 toilet, kitchen and toilet waterproofing works Kitchen, Wei asked leakage is the highest rate of complaints of residential construction quality problems One of the main floor, toilet, bath, kitchen room leakage, the main parts are: floor, floor, floor, wall, and wear Wall pipe root, vertical wall and ground intersection parts, as well as pipeline leakage. . (1) before the construction of toilets, baths and kitchens, the construction units shall organize the design and supervision A design review to verify the waterproof design, detail structure and location, standard practice High, confirm the selected materials and related technical requirements, and promptly prepare the construction plan Ensure the connection of the process and the time required for the entry of each type of work and the protection of the finished product of the process Etc.. . (2) strictly control the construction quality. Review the design plan for failure to reach this slope Set up the upper elevation of the floor drain; make the steel pipe sleeve for the water supply and th

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档