造价容易算漏的100点(Cost is easy to calculate the leakage of 100 points).docVIP

造价容易算漏的100点(Cost is easy to calculate the leakage of 100 points).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价容易算漏的100点(Cost is easy to calculate the leakage of 100 points)

造价容易算漏的100点(Cost is easy to calculate the leakage of 100 points) 100 summary of easy to miss in cost budget 100 summary of easy to miss in cost budget 1. The steam holes in the roof insulation roof of flat roof 2. The embedded iron parts in the stair railing 3, paint, paint construction scaffolding 4, precast slab beam concrete: plate beam head concrete, transportation, installation 5, bored piles: drilling depth into the rock (the project Municipal and highway quota project contains a large gap in content) 6, the installation of indoor plumbing is easy to miss 7. Extra high cost of outdoor pipe installation 8, the installation of the production and material cost angle 9. The coefficient of unilateral earthwork of trench earthwork is easy to omit 10, the artificial coefficient of outbound soil forget to multiply 11, cables, wires and other lists, only to provide a net amount of work, in the group price, but also with reserve, bending, loss and other length 12 、 in the distribution cabinet installation list, the basic steel is easy to leak 13 、 water supply and drainage on the pipe installation list, the sleeve is easy to leak 14, the wind pipe through the wall plugging 15, control valve test, irrigation temporary short tube production and installation. 16, equipment installation, lifting equipment, elimination. 17. The bolts installed on the flanges in the process piping are non valuation materials. 18, installation part: high-rise building additional cost calculation of the base, including 6 or less than 20m of all labor costs. When the high-rise building is in accordance with the ultra high construction condition, the additional cost and the extra high increase fee of the high-rise building are calculated together. 19, roof line, cover plate! Mainly scattered parts! 20, some scattered small components, concrete easy to leakage; 21, the roof partition slot, especially when the overhead insulation layer, cement mortar leveling layer has a partition slot, and in the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档