双塔大横向倾角空间主缆自锚式悬索桥体系转换方案及控制方法.pdfVIP

  • 2
  • 0
  • 约2.22万字
  • 约 8页
  • 2017-09-12 发布于湖北
  • 举报

双塔大横向倾角空间主缆自锚式悬索桥体系转换方案及控制方法.pdf

4 3 11 V o l. 43 N o. 11 2 0 1 0 11 CHINA CIV IL ENGINEER ING JOURNAL N ov. 2010 柯红军 李传习 张玉平 董创文 (, 4 10004) : , ( ) , , / , 0 , , , , , : ; ; ; ; + : U 44 1 . 2 U 448. 25 : A : 1000-131X ( 20 10) 11-0094-08 System transformation program and control principles of suspender tension for a self anchored suspension bridge with two towers and large transverse inclination spatial cables K eH ongjun L i Chuanx i Zhang Yup ing D ong Chuangw en ( Changsha Un vers ty of Sc ence and T echno logy, Changsha 410004, Ch na) Abstract: For the m echan cs and deform at on character st cs o f a se lf-anchored su spens on br dge w th two tow ers and b g transverse ncl nat on spat a l cables dur ng system transform, the pr nc ples of how to determ ne the system transform at on prog ram w ere put fo rw ard. Fo r the J angdong B r dge, the opt m zat on procedure o f system transform at on program w as stud ed. The dea that to tens on the perpetua l su spender near by the tem porary suspender when t s appropr ate to m ake up the defect of the tem po rary su spender w hose allow able tens on value s sm all w as put forw ard. Through optm zat on, a system transform at on program for th s br dge type, wh ch needs not to relax the tem po rary su spender art f c a lly, w as prov ded, and responses o f the J angdong Br dge n every construct on step of the program w ere determ ned. Based on the param eter

文档评论(0)

1亿VIP精品文档

相关文档