玻璃幕墙的施工方案及施工工艺(Construction scheme and construction technology of glass curtain wall).doc
- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
玻璃幕墙的施工方案及施工工艺(Construction scheme and construction technology of glass curtain wall)
玻璃幕墙的施工方案及施工工艺(Construction scheme and construction technology of glass curtain wall)
Construction scheme and construction technology of glass curtain wall
Recommended answer 1. basic requirements
(1) working conditions;
1) the curtain wall construction organization shall be designed, and the construction shall be carried out in strict accordance with the order of the construction organization design.
2) curtain wall should be started after the main structure is completed. As for the curtain wall of high-rise building, because of the time limit, the construction of the curtain wall should be carried out along the high section under the premise of guaranteeing the quality and safety. When the curtain wall is crossed with the upper main structure, reliable protective measures must be taken at the top of the structure and below the curtain wall.
3) curtain wall construction, the original structure of the main construction of the external scaffolding should be retained, and in accordance with the requirements of the curtain wall construction of the necessary changes (the scaffold from the main structure of the body is not less than 300mm). If the curtain wall is installed with a basket, the basket must be safe and reliable
4) the curtain wall construction shall be equipped with necessary safe and reliable lifting tools and equipment.
5) when the decoration project will cause pollution or damage to the curtain wall, the project should be arranged before the curtain wall construction, or should take reliable measures to protect the curtain wall.
6) the curtain wall construction should not be carried out under heavy wind and heavy rain. When the temperature is lower than -5 degrees, glass installation shall not be carried out, and sealant construction should not be carried out in rainy days.
7) should be controlled in the construction of the main structure and check fixed curtain wall on each floor (roof) surface elevation, line size and position deviation of embedded part
您可能关注的文档
- 物理光学(高二选修)(Physical optics (elective Senior 2)).doc
- 物理向心力全解(Total solution of physical centripetal force).doc
- 牛津高中英语模块一词汇表(2011年版)(Oxford high school English module vocabulary (2011 Edition)).doc
- 物理复习工作经验点滴谈(Talking about the experience of reviewing physics).doc
- 物理化学生物细节(Physical, chemical, biological details).doc
- 物理学b类课程教学大纲(草案)(Syllabus for physics class B (Draft)).doc
- 物理实验答案(Physics experiment answer).doc
- 物理性污染(Physical pollution).doc
- 物理学英语词汇(Physics English Vocabulary).doc
- 物理教学中有关提问的一些思考(Some thoughts on asking questions in Physics Teaching).doc
- 人教版七年级下册数学课时练《5.3.2 命题、定理、证明》(2)(含答案).pdf
- 【期末】人教版二年级数学下册期末冲刺卷十一-含答案.pdf
- 人教版六年级语文下册期末测试题 (5).pdf
- 人教版化学九年级下册第一次月考模拟卷(一).pdf
- 人教版九年级数学下册期末检测7附答案.pdf
- 人教版九年级数学上册:23.1.1图形的旋转含答案.pdf
- 人教版九年级上册化末考试推断题专项训练Ⅰ(解析卷).pdf
- 2024年人教版中考英语语法复习:形容词和副词课件.pptx
- 1一个数除以小数课件2024-2025学年人教版三年级数学.pptx
- Unit 9 Section A (1a~3c)( 课件)-2024-2025学年人教版八年级英语.pptx
文档评论(0)