电工.doc(电工.doc).docVIP

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电工.doc(电工.doc)

电工.doc(电工.doc) I. radio questions 1, because of a sudden power outage may cause large economic loss for the load (B). A, a class of load B, two kinds of load C, three kinds of load D, four kinds of load 2, in order to ensure the reliability of a class of power supply, a class of power supply must be (D). A, direct power supply by power plants, B, a reliable standby power supply C, by the line power supply D, more than two cable power supply 3 、 the transformer neutral point (B) grounding is supplied to underground power supply in coal mine power supply. A, strictly forbid B, not direct C, must D, general should 4, fuse melt current rating refers to (D). A and long maximum permissible current of melt B, fuse housing, long duration, maximum permissible current C, fusing current of melt D the maximum operating current that is not fused by the melt through the melt 5. The main purpose of calculating three-phase maximum short-circuit current in power supply system is (B). A, select the electrical equipment B, check the electrical equipment strength C, verify the sensitivity of short-circuit protection, D, and verify the sensitivity of leakage protection 6 、 coal mine power supply, mining area low voltage cable (A). A, aluminum and aluminum insulated cables are strictly prohibited B, aluminum core cable can be used, but aluminum package C can not be used. Aluminum core cable should be popularized D, copper core or aluminium core cable 7, two electric M1 and M2 machines are controlled by KM1 and KM2 respectively. If M2 is required to start after M1 startup, then (B). A connect the movable contact of M2 in series before the M1 coil Before B and M2, the dynamic contact of M1 is connected in series C connect the M2 contact with the M1 before the coil D connect the M2 contact with the M1 before the coil How do 8. pairs of loads supply electricity (A)?. A two independent power, B dedicated line, C single circuit, D and ABC are all right. 9. the time that the short-circuit curre

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档