空压复习(Air pressure review).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
空压复习(Air pressure review)

空压复习(Air pressure review) JZD-060 type drying tower operation One boot 1 close the air outlet valve, pressure relief valve, open the filter before and after the inlet and outlet valve, bypass valve closed, the dryer up to work pressure, open the air valve solenoid valve before and after, and adjust the air pressure to 0.45Mpa. 2 press the power box on the ON button, dryer, electric work. 3 slowly open the air outlet valve after the dryer is in operation. Two test and notice of normal operation of power on 1 check the adjustment pressure every hour is consistent with the original setting pressure, ensure the supply of re heating flow. 2 regularly check drying pressure to verify the correctness of valve opening and closing time 3 when the dryer is regenerated, the pressure in the tower shall not exceed 0.03Mpa, and the program settings of PLC shall not be changed at will. Three parking 1 close the inlet and outlet valves of the filter 2 press the power box on the OFF button to stop working, dryer. 3 close the air outlet valve. 4 slowly open the dryer pressure relief valve until the two drying tower pressure gauges are displayed to zero. Fault phenomenon, cause analysis, treatment method When regeneration, the heating indicator lamp is not bright all the time. The power supply is abnormal according to the nameplate rated voltage Loose or broken wires, find loose or broken line to be checked and repaired Inside the heater, the resistance wire is burnt and replaced Overheating indicator light (alarm), regeneration gas pipeline or other pipeline plug, find the plug to be repaired BXN-100 pressure swing adsorption process for nitrogen production One boot 1 send the power to the cold dry machine and the control cabinet, and send water to the cold drier. 2 switch the air switch of the cold drier, the control cabinet and the relevant single pole switch. 3 turn on the inlet and outlet valve of the cold and dry machine and the two ball valves in front of the automatic trap, and

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档