给排水安装工程施工组织设计(Construction design of water supply and drainage installation project)
给排水安装工程施工组织设计(Construction design of water supply and drainage installation project)
Construction design of water supply and drainage installation project
I. water supply and drainage works
Construction procedure
Structural construction stage
Leave it 1, the cannula is buried 2 and the hole is reserved
3, pre buried iron angle
4, check equipment foundation
Construction of pipe, dry pipe and vertical pipe of pipeline system
Here
Rough decoration stage
Pipe installation 1, main pipe installation
2 、 pipe pressure test and heat preservation
Equipment installation 1, part end equipment and piping
Here
Refined decoration stage
Equipment installation 1 and terminal equipment installation
Manage installation of 1 and end equipment piping
2 、 system pressure test
3 、 local heat preservation and painting
Project content: installation of water supply and drainage, storm pipe installation, support and hanger installation, dry pipe, vertical pipe installation, branch pipe installation, valve installation, floor drain installation, sanitary ware installation.
1. Water supply and drainage works
Main contents of piping installation:
Erection and erection of supports and hangers, installation of dry and vertical branch pipes, installation of valves, anticorrosion and insulation of pipes. The installation of the construction process should be strictly in accordance with the relevant provisions of the construction drawings and technical requirements, the national standard atlas construction and construction technology standard, conscientiously implement the provisions of the company quality manual and related procedures, to ensure the smooth progress of construction installation.
Pipe connection
1) bonding
The plastic pipes used for water supply and drainage shall be bonded with the adhesive provided by the manufacturer. The physical and chemical properties of the adhesive shall comply with the design requirements. When the pipe is adhered to the joint, the gap shall be set up in sum
您可能关注的文档
- 经典劝酒语(Classic Quanjiu language).doc
- 经典周线选股法(Classic weekly stock selection).doc
- 经典大航海时代2攻略(Classic big sailing era 2 Raiders).doc
- 经典导游欢迎词(4篇)(Classic tourist guide (4 articles)).doc
- 经典团队小游戏(Classic team games).doc
- 经典小笑话30则(Classic little joke 30).doc
- 经典对联(Classics couplet).doc
- 经典川菜做法精选(Classic Sichuan cuisine).doc
- 经典广告(Classic advertising).doc
- 终身受益的英文自我介绍~~给他们留一个好印象吧~~(Lifelong benefit from English introduction ~ ~ leave a good impression on them!).doc
- 2 《师说》导学案(含答案)统编版高中语文必修上册.docx
- 《孟子三章》学习笔记(含答案).docx
- 3、桂花雨 任务单(含答案).docx
- 跟我轻松学作文系列专题高级版第二讲如何叙事有波澜 导学案.docx
- 期末复习训练题统编版语文八年级上册(含答案).docx
- 2023-2024年中考语文二轮专题标点符号知识讲解学案.docx
- 【学霸提优】统编版语文四上( 第二单元重难点梳理复习)知识清单.docx
- 小升初语文知识点复习学案 专题十 句段赏析之结构篇(含答案+学生版).docx
- 部编版语文八年级上册古诗词赏析复习资料 (学案).docx
- 第一单元复习导学案 (无答案) 统编版语文七年级下册.docx
文档评论(0)