给排水安装工程施工组织设计(Construction design of water supply and drainage installation project).doc

给排水安装工程施工组织设计(Construction design of water supply and drainage installation project).doc

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
给排水安装工程施工组织设计(Construction design of water supply and drainage installation project)

给排水安装工程施工组织设计(Construction design of water supply and drainage installation project) Construction design of water supply and drainage installation project I. water supply and drainage works Construction procedure Structural construction stage Leave it 1, the cannula is buried 2 and the hole is reserved 3, pre buried iron angle 4, check equipment foundation Construction of pipe, dry pipe and vertical pipe of pipeline system Here Rough decoration stage Pipe installation 1, main pipe installation 2 、 pipe pressure test and heat preservation Equipment installation 1, part end equipment and piping Here Refined decoration stage Equipment installation 1 and terminal equipment installation Manage installation of 1 and end equipment piping 2 、 system pressure test 3 、 local heat preservation and painting Project content: installation of water supply and drainage, storm pipe installation, support and hanger installation, dry pipe, vertical pipe installation, branch pipe installation, valve installation, floor drain installation, sanitary ware installation. 1. Water supply and drainage works Main contents of piping installation: Erection and erection of supports and hangers, installation of dry and vertical branch pipes, installation of valves, anticorrosion and insulation of pipes. The installation of the construction process should be strictly in accordance with the relevant provisions of the construction drawings and technical requirements, the national standard atlas construction and construction technology standard, conscientiously implement the provisions of the company quality manual and related procedures, to ensure the smooth progress of construction installation. Pipe connection 1) bonding The plastic pipes used for water supply and drainage shall be bonded with the adhesive provided by the manufacturer. The physical and chemical properties of the adhesive shall comply with the design requirements. When the pipe is adhered to the joint, the gap shall be set up in sum

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档