- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
检漏细则(Leak inspection rules)
检漏细则(Leak inspection rules)
Chapter I General Provisions
In order to ensure the safety of the mine and the people, the detailed rules are formulated in accordance with the provisions of the 434th regulations of the coal mine safety regulations (92 Year Edition).
Article first of the rules are only applicable to the neutral point directly connected with various leakage protection devices to 1140V and below power, lighting, power grid, including the protection unit with earth leakage, leakage tripping and selective leakage protection function of various types of equipment (hereinafter referred to as the leak protection device).
Second personnel engaged in the installation of underground electrical equipment, operation, maintenance and maintenance personnel should be familiar with the rules.
Third of the leakage protection devices used in underground mines, (wells) must be dedicated for maintenance, maintenance and setting, and formulate the corresponding management system according to the requirements of the rules, the normal operation of leakage protection device.
Fourth leak detection protection device explosion-proof performance must comply with the national standard GB3836 explosive environment with explosion-proof electrical equipment requirements. The electrical performance of the leak detection protection device must be checked by the inspection unit of the coal system.
A leak detection protection device with leakage lock or selective leak detection protection device shall be installed on the low voltage feeder line of fifth underground substations.
Coal (rock) electric drill, lighting feeder, must be equipped with automatic cut off leakage feeder line leak detection protection device.
Low voltage electromagnetic starter shall have the function of leakage locking.
Sixth operation leak detection protection device performance must be reliable, strictly forbid to dismantle or disable.
Seventh selective leak detection protection devices must be used (i.e., the main
您可能关注的文档
- 杨利伟(Yang Liwei).doc
- 杨贵妃香体(The body of Yang Fei Xiang).doc
- 杨鹏17天gre背诵法(Yang Peng 17 days GRE recitation).doc
- 杭州余杭区疾病监测地理信息系统与建立应用(Geographic information system for disease surveillance and its application in Yuhang District of Hangzhou).doc
- 杨玉良科技精英称号申报材料含伪造的leibniz奖,精英称号应立即撤销!(The title of Yang Yuliang's science and technology elite should be cancelled immediately, including the fake Leibniz prize and the elite title!).doc
- 来北京看病实用技巧大全(Practical skills to see a doctor in Beijing).doc
- 杭州小吃地图(Hangzhou snack map).doc
- 杭州市中小学生国学知识网络大赛4(Hangzhou primary and secondary school students knowledge network competition 4).doc
- 杜曼右脑圆点卡学数学(Duman's right brain Polka Dot math).doc
- 杭州法云安缦度假酒店案例分析(The analysis method of Hangzhou cloud resort unadorned case).doc
- 高校教师资格证之《高等教育心理学》能力提升题库含答案详解(夺分金卷).docx
- 机器学习在团队能力提升中的作用.docx
- 高校教师资格证之《高等教育心理学》能力提升题库含答案详解(培优b卷).docx
- 高校教师资格证之《高等教育心理学》能力提升题库含答案详解(精练).docx
- 高校教师资格证之《高等教育心理学》能力提升题库含答案详解(综合卷).docx
- 城市供用气合同(示范文本) (2).pdf
- 高校教师资格证之《高等教育心理学》能力提升题库含答案详解(综合题).docx
- 新型农村社区体育锻炼影响因素分析.docx
- 高校教师资格证之《高等教育心理学》能力提升题库含答案详解(培优a卷).docx
- 高校教师资格证之《高等教育心理学》能力提升题库含答案详解(典型题).docx
文档评论(0)