波形梁钢护栏的施工方案、施工方法(Construction scheme and construction method of corrugated beam steel guardrail).docVIP
- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
波形梁钢护栏的施工方案、施工方法(Construction scheme and construction method of corrugated beam steel guardrail)
波形梁钢护栏的施工方案、施工方法(Construction scheme and construction method of corrugated beam steel guardrail)
The first section is the construction plan and construction method of corrugated steel guardrail
I. construction methods and plans
In order to ensure the engineering quality reach the standard of excellence, according to technical specifications for design and construction of highway traffic safety facilities, according to the design documents and inspection standards, we will send professional and technical personnel to the professional component manufacturers on the whole process of quality control. At the same time, the construction site technical staff a careful survey of the site, the necessary level of the construction site, and then complete the measurement lofting, everything began to wave beam installation is ready, specific programs are as follows:
(1) preparation for construction
Before the start of construction, construction and technical personnel familiar with and understand the design drawings and related construction specifications, and the construction personnel went to the construction site and design drawings check, find the road construction pile, various structures and structural barriers place, do the construction equipment and materials of construction work at the same time.
1, steel guardrail column lofting
The column should be carried out according to the layout design drawings, and to the bridge, tunnel and culvert, interchange, crossing etc. as the control points of the location, can be adjusted by adjusting the spacing, and allocation method based on interval number fraction.
For accurate lofting and ensuring the alignment of the guardrail, the section number is checked and closed.
The column, lofting each column should be investigated after the position of the ground state, such as the case of underground communication pipeline and water discharge, or on the top of the culvert buried depth is insufficient, should adjust certain column positio
您可能关注的文档
- 沉香价值(Value of aloes).doc
- 沉默的羔羊 影评 经典对白(Silent lamb dialogue).doc
- 沐子食谱(Mu recipes).doc
- 沙格列汀fda原版使用说明书最新版(Shah Glenn Dean FDA original manual, latest version).doc
- 沙棘十大功效(Ten functions of Seabuckthorn).doc
- 沙棘果油 沙棘甘之福软胶囊(Seabuckthorn fruit oil, sea buckthorn sweet soft capsule).doc
- 沉积岩试题大全(Sedimentary rock examination questions).doc
- 沙龙操作服务流程(Sharon operation service process).doc
- 没有人天生就是成功者(No one is born a success).doc
- 没说国企改革该停(Did not say that state-owned enterprises reform should stop).doc
- 30万吨绿色甲醇制10万吨绿色航空煤油项目可行性研究报告写作模板-申批备案.doc
- 正确对待白血病的护理.pptx
- 有机合成课件高二下学期化学人教版选择性必修3.pptx
- 2024年粮油食品检验人员经典例题及参考答案详解【基础题】.docx
- 2024年粮油食品检验人员经典例题及参考答案详解(综合题).docx
- 税务改革对企业现金流管理和融资战略的影响.docx
- 2024年粮油食品检验人员经典例题及完整答案详解.docx
- 40万套车厢五金件搬迁技改项目可行性研究报告写作模板-拿地备案.doc
- 2024年粮油食品检验人员经典例题【必考】附答案详解.docx
- 2024年粮油食品检验人员综合提升测试卷含完整答案详解【夺冠系列】.docx
文档评论(0)