世行贷款邢台工业余热集中
China
Hebei Clean District Heating Project
Xingtai Industrial Waste Heat Central Heating Project
Abbreviated Resettlement Action Plan
Xingtai Xuyang Anneng Heating Co., Ltd. (XXAH)
October 2015
Abbreviations
AAOV - Average Annual Output Value AH - Affected Household AP - Affected Person HCCRC - Hebei China Coal Xuyang Coking Co., Ltd. HD - House Demolition LA - Land Acquisition ME - Monitoring and Evaluation MLS - Minimum Living Security RAP - Resettlement Action Plan XXAH - Xingtai Xuyang Anneng Heating Co., Ltd. XXCC - Xingtai Xuyang Coal Chemical Co., Ltd.
Units
Currency unit = Yuan (RMB)
$1.00 = CNY6.15
1 hectare = 15 mu
Contents
1. Overview 5
1.1 Implementation agencies 5
1.2 Construction purpose and main content 5
1.3 The heating source 5
1.4 ?The first heating station land compensation and resettlement due diligence 6
1.5 Area and types of land occupied for heat exchange stations and heating pipelines 6
1.6 Preparation process and methods of the RAP 7
2. Background of the Subproject 7
2.1 Socioeconomic profile of the subproject area 7
2.2 Background and significance of the Subproject 8
2.3 Components 8
2.4 Investment 14
2.5 Key technical and economic indicators 14
3. Construction schedule 14
4. Impacts of the Subproject 15
4.1The affected area and types 15
4.2 Permanent land occupation 15
4.3 Temporary land occupation 15
4.4Other social impacts 17
4.4.1 Construction on roads and in residential areas will affect road traffic, residents’ daily life, and nearby stores’ business 17
4.4.2 With the closedown of gas-fired boiler rooms, boiler workers will be faced with reemployment. 17
4.4.3 Some community residents have to pay heating network access charges, and few have to share courtyard pipeline installation or reconstruction charges, imposing a financial burden on poor households. 17
4.5 Measures to mitigate impacts 17
4.5.1 Minimize negative impacts of construction 17
4.5.2 Help workers of natural gas boiler rooms closed down get reemploy
您可能关注的文档
最近下载
- 2023年山东省青岛市市北区“未来之星”选拔活动试卷(四、五年级).pdf VIP
- 鲁科版高中化学目录.pdf VIP
- 金融英语翻译 Chapter 15 应收款项.pptx VIP
- 烟草法律知识考试真题题库(含答案).pdf VIP
- 三年级上册 劳动教案.pdf VIP
- DB12T 775-2018 防雷装置检测业务规范.docx VIP
- 专题2.6 一元二次方程应用-几何动态问题(专项训练).pdf VIP
- 觉醒年代人物小传800字.doc VIP
- [通力KONE电梯资料]CTP-07.30.S2A_安全钳.pdf VIP
- 【名校课堂】九年级数学下册 28.1 锐角三角函数 正弦(第1课时)练习 (新版)新人教版.doc VIP
文档评论(0)