- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
110 kV substations digital transformation case analysis
[Abstract] This paper briefly introduces the basic concept of digital substation, Analysised substation digitization reconstruction examples based on 110 kV substations. A detailed analysised of the substation secondary equipment such as changes in operating mode. Digital Substation discussed possible options for reform, and according to the results of the operation of digital substation work out countermeasures and Recommended.
[Key words] digital substation; automation; Electronic Transformer
With automation and computer network traffic monitoring and protection technology, the rapid development in Past two decades has made substantial progress has been achieved for the digital substation automation system . Network laid the technical foundation for fulfilling the other hand, with the special high-voltage large-capacity .The gradual formation of large scale grid, the grid stable and reliable control of the safety information exchange ,And put forward higher requirements of the urgent. Digital Substation substation construction will be Trends .
1. the characteristics of digital substation
The basic features of digital substation can be summarized as: intelligent primary equipment, secondary equipment network, automated operation and management system. Since the station relative to conventional integrated, digital substation equipment, the protective principle, the internal algorithm, logic has not fundamentally changed, but in sampling digital, networked communication medium, communication interface standardization brought changes to improve the reliability of substation automation system. Reliability of information transmission can be achieved; secondary wiring is simple; measurement accuracy; share unified information platform, reduce duplication of equipment; easy functionality expansion; management automation.
2. 110 kV Substation rehabilitation programs
1) a part of. 110kV single busbar sub-main wiring
您可能关注的文档
- 面向对象方法短信收发系统设计(开题报告).doc
- 土木工程中英文翻译.doc
- 农村饮水安全工程规划设计中常遇见问题及解决意见.doc
- 团购协销系统——中高端白酒营销突破升级模式.doc
- 温州现代物流发展调查与思考.doc
- 汽车修理厂安全生产管理制度汇编67.doc
- 汽车知识详细扫盲了!!!帮你更好选择适合自己车(含SUV文库.doc
- 虾蟹池塘中常见水质问题及处理方法.doc
- 浅谈《国演义》中仁义思想.doc
- 孝来孝往系列活动明德学社.doc
- 数据仓库:Redshift:Redshift与BI工具集成.docx
- 数据仓库:Redshift:数据仓库原理与设计.docx
- 数据仓库:Snowflake:数据仓库成本控制与Snowflake定价策略.docx
- 大数据基础:大数据概述:大数据处理框架MapReduce.docx
- 实时计算:GoogleDataflow服务架构解析.docx
- 分布式存储系统:HDFS与MapReduce集成教程.docx
- 实时计算:Azure Stream Analytics:数据流窗口与聚合操作.docx
- 实时计算:Kafka Streams:Kafka Streams架构与原理.docx
- 实时计算:Kafka Streams:Kafka Streams连接器开发与使用.docx
- 数据仓库:BigQuery:BigQuery数据分区与索引优化.docx
文档评论(0)