- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
主要生产日程介绍
Master Production Schedule
Master Production Schedule generates orders for Items with Order Method (P-MPS, see Item Master). However data must be maintained in Maintain MPS Item screen. This screen is separately maintained and here user can override Economic Order Qty, Lead time, Lot Sizing Method. For user’s convenience Pull MPS Item screen is added so user can pull all MPS type items in one shot from Item Location. Item having BOM can be Make/Buy type, those which do not can only be of Buy type.
Orders of a MPS Item will only be generated if there is net demand of item i.e. total demand(Sales Order, Warehouse transfer outgoing, Forecast, dependent demand of Item(if any) exceeds total supply(purchase, production, warehouse transfer coming in, on hand inventory).
Following are typical steps to maintain data for MPS:
Maintain Items in Item Master with Order Method P.
Maintain above Items in Item Location.
Create Formula for Item.
Create BOM of Item, attach Item to a formula, set BOM type ‘Finished Good’ if Item is a Finished good set appropriate fill levels. Set BOM type ‘Intermediate’ if Item is an intermediate(i.e. item has a formula and is used in some another formula). For containers set BOM type to ‘Assembly’ if item is container assembly, here formula is not applicable.
Release the BOM.
In Maintain MPS Item screen maintain data. User can use pull MPS Item screen to maintain all data in one shot.
Maintain company calendar, specify weekly holidays if any, Orders will not be generated on holidays.
Maintain Planning calendars, at least one planning calendar is required to run MPS/MRP. Planning calendars in 7.10 have no origin date and are used to group data in forecasting and Planning worksheet.
Maintain Forecasts of Items . Now that Forecasts in 7.10 are bucket less, one has to maintain data in forecast again. Data in forecasts are now saved on daily basis but is grouped by Planning Calendar. If user wants to view data with other
原创力文档


文档评论(0)