长钢9#高炉喷煤系统的优化(Optimization of steel 9# blast furnace system).docVIP

长钢9#高炉喷煤系统的优化(Optimization of steel 9# blast furnace system).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
长钢9#高炉喷煤系统的优化(Optimization of steel 9# blast furnace system)

长钢9#高炉喷煤系统的优化(Optimization of steel 9# blast furnace system) In recent years, BF process improvement, medium speed mill pulverizing system using a powder bag short process, blowing system adopts dense phase conveying process and safety injection of high volatile bituminous coal has become the first choice for [1][2] system design. Combining the old coal injection system of my factory production experience, we optimized the coal injection system of 9# blast furnace: the speed mill powder, a powder collecting device, powder collecting bag, the two mills share a fan and a blast furnace gas as the drying gas, using their own developed high performance mixer special filter of coal, dense phase conveying, application, Y and distributor of anthracite and bituminous coal injection technology for mixed spraying. In the 9# blast furnace production at ninth days, the coefficient of 2.6t/ (m3.d) above, the coal ratio 170kg/t, injection rate 23.5t hours, the new PCI system provides a powerful guarantee for the production of blast furnace reached as soon as possible. Table 1 9# blast furnace technology index list The coefficient of coal coke ratio than the fuel ratio of oxygen enrichment rate wind temperature and wind pressure volume of top pressure by date 1 Optimization of pulverizing system The supporting system of steel 1080m3 blast furnace system is the new 9# of the blast furnace, it needs to meet the needs of pulverized coal injection in blast furnace 8# (formerly indirect injection), 100% bituminous coal is designed according to the present stage all blowing, blowing 70% local +30% lean coal long flame coal (steel blowing coal component analysis are shown in Table 2), the design capacity of 200kg/t coal injection ratio (BF utilization coefficient 3). Steel blast furnace injection of pulverized coal facilities mainly by coal preparation system, pulverizing system and injection system, process flow diagram is shown in figure 1. (1) the coal preparation system: when the car

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档