- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
预算易漏项(Easy item budget)
预算易漏项(Easy item budget)
The cost budget easily misses 100 items
1 the steam holes in the roof insulation roof of flat roof
2 embedded iron pieces in the stair railing
3 scaffold for paint and coating construction
4 precast slab beam concrete: plate, beam head concrete, transportation, installation
5 bored pile: drilled into the depth of rock (the municipal and highway quota projects contain a great gap in content)
6, the installation of indoor plumbing is easy to miss
7 extra high cost of outdoor pipe installation
8 angle steel fabrication and installation and material costs
9 the coefficient of unilateral soil waste in trench earthwork is easy to miss
10, the artificial coefficient of outbound soil forget to multiply
11 the list of cables and wires is only supplied with a net amount of work. In addition, the allowance, bending, loss and so on should be added to the group price
12 the base steel is easy to leak in the distribution cabinet installation list
13 water supply and drainage on the pipe installation list, the casing is easy to leak
Plugging of 14 air duct through wall
15 control valve test pressure irrigation temporary short tube production and installation.
16, equipment installation, lifting equipment, elimination.
17. The bolts installed on the flanges in the process piping are non valuation materials.
18, installation part: high-rise building additional cost calculation of the base, including 6 or less than 20m of all labor costs. When the high-rise building is in accordance with the ultra high construction condition, the additional cost and the extra high increase fee of the high-rise building are calculated together.
19, roof line, cover plate! Mainly scattered parts!
20, some scattered small components, concrete easy to leakage;
21, the roof partition slot, especially when the overhead insulation layer, cement mortar leveling layer has a partition slot, and in the heat insulation board also need to do partition slot;
22, some of the specifications i
您可能关注的文档
- 隧道水害原因及治理探讨(Discussion on the cause of tunnel water damage and its treatment).doc
- 隐性人力资本(Implicit Human Capital).doc
- 难保父母恩(No parents).doc
- 难字解。(The difficult solution.).doc
- 隐蔽和显示盘符(Hidden and display drive).doc
- 随身听手册-313(Walkman manual -313).doc
- 雀哥石油地质学总复习(Review of petroleum geology in Columbia).doc
- 雅典娜_如梦初醒-攻略(Athena _ - as if wakening from a dream.).doc
- 雅客食品----经销网络布建办法(Yake food distribution network deployment method).doc
- 雀巢淡奶油(Nestle light cream).doc
最近下载
- 2025届高中英语一轮话题复习(教师版):主题一人与自我 语境3 健康的生活方式,积极的生活态度——饮食与健康.docx VIP
- R-2000ic操作说明书文档.pdf VIP
- 安全管理软件:Genetec二次开发_(4).GenetecAPI使用指南.docx VIP
- 三会一课党建.ppt VIP
- YD∕T 4172-2022 切片分组网络(SPN)设备技术要求.pdf
- DB43T2052-2021 排水降噪沥青路面应用技术规范.docx VIP
- 如何做好新能源项目现场施工管理.pptx VIP
- 普通话吟诵教程-徐健顺224页PPT.ppt VIP
- 小学二年级上册《健康成长》全册教案教学设计 .pdf VIP
- 低GI食物全攻略.PDF VIP
文档评论(0)