挖掘变更索赔潜力 扭转亏损实现盈利(Mining, changing claims potential, reversing losses and achieving profitability).docVIP

挖掘变更索赔潜力 扭转亏损实现盈利(Mining, changing claims potential, reversing losses and achieving profitability).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
挖掘变更索赔潜力 扭转亏损实现盈利(Mining, changing claims potential, reversing losses and achieving profitability)

挖掘变更索赔潜力 扭转亏损实现盈利(Mining, changing claims potential, reversing losses and achieving profitability) Mining, changing claims potential, reversing losses and achieving profitability Li Jingshan Duan Jun Shaanxi Hanjiang hydropower station is located in Shiquan County Health City of Shaanxi province and Hanyin county at the junction of power station, II and other large (2) type project, a total capacity of 230 million cubic meters. The installation of 3 sets of 60MW Kaplan turbine generator unit, a roller compacted concrete gravity dam, crest length 346m, the maximum dam height of 61.8m. The projects we have built include: surface hole dam section, Zuo Zhongkong dam section, ship lift arrangement, left non dam section, energy dissipation and anti flood project, metal structure installation, mechanical and electrical equipment installation project, etc. the tender offer is 63 million 909 thousand and 800 yuan. The contract period started in November 2004 and completed in March 2007. The total amount of completion of dam works: concrete pouring 226 thousand M3, steel reinforcement 4000t, consolidation drilling 10000m, grouting ash consumption 530T, prestressed anchor 16 million kN.m, gold knot installed 2600t, completed a total investment of 96 million yuan. Hi River Hydropower Station Dam project started in November 2004, preliminary estimates, the project losses of 10 million yuan, in May 2005, according to the project construction progress detailed forecast, is expected to lose 6 million 201 thousand and 700 yuan. In the face of the grim situation, complete the work and management objectives to ensure the project department to continuously strengthen the lean management, increase income through alteration and claim, not only to reverse the loss situation, and realize the business benefits. 1 project hidden risks 1.1 harsh contractual conditions The project is in the domestic market is extremely scarce in the water environment in the standard, the project bidding owners

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档