最新风电场运维人员技能考试试卷(Latest wind, electric field operation and maintenance personnel skills examination paper).doc
- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
最新风电场运维人员技能考试试卷(Latest wind, electric field operation and maintenance personnel skills examination paper)
最新风电场运维人员技能考试试卷(Latest wind, electric field operation and maintenance personnel skills examination paper)
Wind farm operators in 2012
Skills examination paper (theoretical part)
First, fill in the blanks (30 empty, 0.5 cents per minute, 15 points altogether)
1. frequency converter according to the main circuit way of classification, can be divided into voltage type inverter and current type inverter.
2. the engine room can be rotated in two directions. The direction of rotation is detected by the proximity switch. When the number of the circle in the same direction of the yaw limit is reached, the limit switch signal will be sent to the control unit, control unit and the quick stop, reverse unmoor.
3. the preventive maintenance of the wind turbine is regularly maintained in strict accordance with the maintenance schedule provided by the manufacturer.
4. when the power system is running, the frequency is controlled by the active power of the system, and the voltage is controlled by the reactive power of the system.
The relationship between the resistance of the 5.PT100 sensor and the temperature conversion is as follows: when the resistance is 100, the temperature is 0 centigrade.
6. tickets should be two copies, a copy should be kept in place of work by the responsible person Shouzhi, another by Licensor receives.
7. if wind speed exceeds a limit, such as 5 or 10 minutes mean (average wind speed), 5 second average (gust speed), must stop working immediately. Maintenance and repair work shall not be carried out. The blade is located at any position between the work position and the oar position.
The measured data points of the wind tower in the 8. wind farm are located at the height of the fan hub, and should include parameters such as wind speed, wind direction, temperature and air pressure.
9. increasing the tower height of the generator can reduce the influence of turbulence intensity.
10. the insulation level of the generator of the wind turbine is usually F clas
您可能关注的文档
- 日本动画、(Japanese animation,).doc
- 日本古建筑艺术漫谈(A brief talk on Japanese ancient architectural art).doc
- 日本后妃传·平安时代(Japanese wives - the era of peace).doc
- 日本古建筑艺术(The art of ancient architecture in Japan).doc
- 日本地震将对中国楼市产生五大影响(Japan earthquake will have five major impact on China's property market).doc
- 日本地震的奇怪和不奇怪(The earthquake in Japan is strange and not surprising).doc
- 日本女生最钟情护肤品排行榜(Japanese girls love skin care list best).doc
- 日本天皇年表及大事记(Chronology and events of the emperor of Japan).doc
- 日本女生的名字(The names of Japanese girls).doc
- 日本寿司介绍(Introduction to Japanese sushi).doc
最近下载
- 17周新模式英语1Unit1-4全套教案.pdf
- 安川机器人YASKAWA AR2010 说明手册.pdf
- 西南交通大学(材料力学B)机械类作业系统作业与详细解答.docx
- 基于人用经验的中药复方制剂新药临床研发指导原则(试行).pdf
- 《原电池 第1课时》示范课教学设计【化学人教版高中选择性必修第一册(新课标)】.docx
- GBZ 178-2017 粒籽源永久性植入治疗放射防护要求.pdf
- 中国国家标准 GB/T 4437.1-2023铝及铝合金热挤压管 第1部分:无缝圆管.pdf
- 教育评价引领学生健康成长20151212-黑龙江教育科研.ppt
- 现代名图说明书|Hyundai Mistra Owner's Manual.pdf
- 标底、工程量清单、招投标控制价和拦标价的区别.pdf
文档评论(0)