监理过程控制程序(Supervision process control procedure).doc

监理过程控制程序(Supervision process control procedure).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
监理过程控制程序(Supervision process control procedure)

监理过程控制程序(Supervision process control procedure) Supervision process control procedure 1 Purpose On the basis of the capital management mode of small owner and big supervision and consultation, in order to make the project supervision process in a controlled state, to ensure the quality of construction supervision service according to company guidelines and objectives, establish the procedure. 2 scope of application The principles and methods of the work relationship between the company and the project supervision team and the service of the project supervision party are stipulated. 3 responsibilities 3.1, the supervision process under the leadership of the general manager of the company, deputy general manager (Infrastructure Management) organization and implementation. 3.2 the engineering department is responsible for the implementation of the supervision process control. 3.3 the planning department shall supervise, inspect and examine the performance of the contract by the project supervision team. 4 management content and requirements 4.1, the company through the tender to determine the supervision unit, the implementation of the procurement management control procedures. 4.2 after signing the contract, the supervision unit shall appoint the chief supervision engineer and enter the project site to carry out supervision work. The company provides work and office conditions for the project supervision team as provided for in the contract. 4.3 the chief supervision engineer shall organize the preparation of the supervision plan for the project, which shall be approved by the chief engineer or general manager of the supervision company and submitted to the general manager or deputy general manager of the company (capital construction management) for approval. 4.4 of the total supervision engineer to organize the professional supervision engineer professional writing rules for the implementation of supervision and report for the record company, the relevant functional

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档