- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
锅炉房(Boiler Room)
锅炉房(Boiler Room)
The third chapter, burning facilities
Section 1 facilities for coal burning
Article 3.1.1 coal-fired boilers should be used near the coal species.
Article 3.1.2 the combustion equipment of a boiler shall be adapted to the type of coal used and shall meet the following requirements:
One, can better adapt to changes in load.
Two, better energy conservation;
Three, conducive to environmental protection.
Article 3.1.3 a chain grate shall be adopted when choosing a combustion equipment with a layer (including a coal feeder or chain type).
Article 3.1.4 a coal grate with a high coking capacity and broken coke shall not be used in its combustion equipment.
Article 3.1.5 coal mill type selection shall be based on the characteristics of coal-fired. The direct blowing pulverizing system should be adopted when choosing fan mill or hammer shaft coal mill. Each boiler should be equipped with 1 spare units. When the ball mill is used, the bunker type pulverizing system should be adopted. Each boiler should be equipped with 1 units of coal pulverizer, and its calculation output shall be less than 115% of the total amount of coal consumed by the rated evaporation capacity of the boiler.
Article 3.1.6 the storage capacity of pulverized coal bin shall meet the boiler rated evaporation capacity of 3 ~ 5h coal consumption.
Article 3.1.7 the design of the original coal bunker, pulverized coal bunker and coal caving pipe of the pulverizing system shall comply with the following requirements:
The inner wall of a coal bin and coal should be smooth wear, wall angle of not less than 60 degrees angle for adjacent wall arc:
The lower part of the two, the export of raw coal bunker, should set the circular hyperbola small metal coal hopper;
Three, the coal tube will be round, and properly increase its tilt angle;
Four, coal bunker should be sealed and measuring powder facilities, and must prevent heating and moisture. The metal coal bin should be kept warm.
Article 3.1.8 of the
您可能关注的文档
- 工作总结开展漏征漏管户清查工作总结(Summary of the work carried out louguanhu duty inventory work summary).doc
- 工作总结作风建设总结(Work summary, style construction summary).doc
- 工作总结申报高级职称工作总结(Job summary, reporting, senior title work summary).doc
- 工作总结某区国税局工作总结(Work summary, a district tax bureau work summary).doc
- 工厂规章制度(plant rules).doc
- 工厂化装修(Factory decoration).doc
- 工商所全年工作计划(Annual work plan of industrial and Commercial Institute).doc
- 工作水平设计的方法(Work level design method).doc
- 工商行政管理基础知识手册(Handbook of basic knowledge on Business Administration).doc
- 工厂安全管理 最管理佳实践(Best practices in plant safety management).doc
- 锦州医学院2004年硕士研究生入学考试试卷(Liaoning Medical University 2004 Master entrance examination examination paper).doc
- 锅炉调整(Boiler adjustment).doc
- 锦州烧烤现状和发展趋势调查(Survey of the status quo and development trend of Jinzhou barbecue).doc
- 键盘上每个键位的作用(The role of each key on the keyboard).doc
- 金石录后序翻译(Sequential translation of inscriptions on gold and stone).doc
- 间架结构九十二法(The form and structure of the ninety-two law).doc
- 降低吹灰蒸汽对炉内受热面吹损(Reduce the blow to the heating surface of the furnace by blowing soot).doc
- 集中整治五线两资源治安秩序新闻发布会讲话(Focus on the five lines and two resources security order press conference speech).doc
- 集中管理为核心的财务管理模式的构想(The concept of centralized management as the core of financial management).doc
- 集团公司首期车间主任培训班开班仪式上的讲话(The first group of workshop director training classes ceremony).doc
文档评论(0)