- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
西交《发电厂电气部分》在线作业(West to power plant electrical parts online homework)
西交《发电厂电气部分》在线作业(West to power plant electrical parts online homework)
West to power plant electrical parts online homework
Total score: 100 test time: -
Radio examination
A multiple-choice question
Judgment question
Radio examination questions (20 questions, 40 points)
1., double bus lines running at the same time, with single bus section wiring features, ().
A. therefore, the double bus connection is equivalent to the single bus sectional wiring
B., but the single bus segment connection has greater running flexibility
C. and the number of devices is the same
D. but dual bus connections have greater operational flexibility
Full marks: 2
When the rated voltage of the 2. voltage transformer is 3 to 35kV, the primary winding needs to be connected to the circuit to be measured.
A. disconnecting switch and contactor
B. disconnecting switch and high voltage fuse
C. circuit breaker and high voltage fuse
D. circuit breaker and current limiting reactor
Full marks: 2
The 3. signal device is divided by use, excluding ()
A. accident signal
B. Trailer signal
C. position signal
D. blinking signal
Full marks: 2
4., 220kV and above transformer substation wiring group should adopt ()
A. ygn12
B. Dd12
C. Dyn11
D. Yd11
Full marks: 2
The 5. neutral point is grounded by arc suppression coil
A. under compensation
B. full compensation
C. over compensation
D. does not compensate
Full marks: 2
6. the phase operation of the generator will lead to ()
A. static stability reduction
B. static stability improved
C. had no effect
D. is not sure
Full marks: 2
7. of the following is not part of the distribution equipment
A. switch device
B. protection and measuring appliances
C. generator
D. bus
Full marks: 2
8., in order to ensure the dynamic stability of electrical equipment, the choice of electrical equipment should meet () conditions.
The A. dynamic steady current is less than the maximum two phase impact short-circuit current through the appliance
The B. dynamic steady current is greater than t
您可能关注的文档
- 课纲下载-管理能力提升(Class download - enhance management capabilities).doc
- 课题解题的策略(Topic strategies for solving problems).doc
- 谷歌地球-上帝之眼目标经纬度(Google Earth - the eye of God, the latitude and longitude of the goal).doc
- 购买地板十大秘籍(Buy Flooring ten cheats).doc
- 货物运输(Freight transportation).doc
- 购物网站特点及区别(Shopping website features and differences).doc
- 购房者如何选一套好房 买房六大要素最重要(Property buyers how to choose a good house, buy six elements is the most important).doc
- 贯彻民生工作思路 深化民生领域改革(Carry out the work of people's livelihood and deepen the reform of people's livelihood).doc
- 贯彻落实科学发展观面临的难点问题(Implementing the difficult problems faced by Scientific Outlook on Development).doc
- 课本回顾(Textbook review).doc
- 西交《应用文写作》在线作业(West online practical writing online homework).doc
- 血糖生成指数(gi)表(Glycemic index (GI) table).doc
- 西交《工程结构抗震》在线作业(West to project structure earthquake resistance online homework).doc
- 网优试题-动态功控(Network optimization test dynamic power control).doc
- 西交《电工电子技术(高起专)》在线作业(West to the electrical and electronic technology (high starting up) online homework).doc
- 西交《护理学导论(高起专)》在线作业(West to the Introduction to nursing (high school) online homework).doc
- 西关美食攻略2(West food introduction 2).doc
- 西凤的竞争对手是谁(Who is the competitor of Xifeng).doc
- 西南交《审计学a》在线作业二(Southwest China, auditing a, online homework two).doc
- 西南林学院(Southwest Forestry University).doc
文档评论(0)