西交《发电厂电气部分》在线作业(West to power plant electrical parts online homework).docVIP

西交《发电厂电气部分》在线作业(West to power plant electrical parts online homework).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
西交《发电厂电气部分》在线作业(West to power plant electrical parts online homework)

西交《发电厂电气部分》在线作业(West to power plant electrical parts online homework) West to power plant electrical parts online homework Total score: 100 test time: - Radio examination A multiple-choice question Judgment question Radio examination questions (20 questions, 40 points) 1., double bus lines running at the same time, with single bus section wiring features, (). A. therefore, the double bus connection is equivalent to the single bus sectional wiring B., but the single bus segment connection has greater running flexibility C. and the number of devices is the same D. but dual bus connections have greater operational flexibility Full marks: 2 When the rated voltage of the 2. voltage transformer is 3 to 35kV, the primary winding needs to be connected to the circuit to be measured. A. disconnecting switch and contactor B. disconnecting switch and high voltage fuse C. circuit breaker and high voltage fuse D. circuit breaker and current limiting reactor Full marks: 2 The 3. signal device is divided by use, excluding () A. accident signal B. Trailer signal C. position signal D. blinking signal Full marks: 2 4., 220kV and above transformer substation wiring group should adopt () A. ygn12 B. Dd12 C. Dyn11 D. Yd11 Full marks: 2 The 5. neutral point is grounded by arc suppression coil A. under compensation B. full compensation C. over compensation D. does not compensate Full marks: 2 6. the phase operation of the generator will lead to () A. static stability reduction B. static stability improved C. had no effect D. is not sure Full marks: 2 7. of the following is not part of the distribution equipment A. switch device B. protection and measuring appliances C. generator D. bus Full marks: 2 8., in order to ensure the dynamic stability of electrical equipment, the choice of electrical equipment should meet () conditions. The A. dynamic steady current is less than the maximum two phase impact short-circuit current through the appliance The B. dynamic steady current is greater than t

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档