- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大理石干挂施工初步方案(Preliminary plan for construction of marble dry hanging)
大理石干挂施工初步方案(Preliminary plan for construction of marble dry hanging)
Catalog
I. General Situation of the project
Two 、 construction process
Three, quality requirements
Four 、 construction technology and process
Five, quality control standards
Six, finished product protection
Seven safety and environmental management
I. General Situation of the project
Project Name: Wang Office of land and resources
Project address: Wang Zhen Heng Yun Bei Lu
Construction unit: Jiangning branch of Nanjing Municipal Bureau of land and resources
Design Institution: Beijing construction planning and Research Institute of China
Supervision unit: Jiangning Nanjing Construction Supervision Co., Ltd.
Construction unit: Nanjing Overseas Construction Engineering Corporation
The total construction area of 1388 square meters of the project, frame structure, 4 floors on the ground.
Two 、 construction process
Put the line - - plate drilling - rust treatment installation - plate connection plate - pendant installation - sealing - clearance - detection of the installation of steel frame
Three, quality requirements
1, decorative panel varieties, specifications, colors must comply with the design requirements, and its quality must comply with the relevant standards of stone.
2. The installation of the panel must be firm, smooth, no missing, angle and cracks.
Four 、 construction technology and process
1 、 construction preparation
(1) preparation of auxiliary materials
1) all the keel, channel, angle and beam are galvanized.
2) special dry hanging pendant, parting with 6mm thick white organic film as pad stone.
3) welding rod, epoxy resin, anchorage agent, paper adhesive tape and black light steel keel lining strip. All auxiliary materials shall be checked and accepted according to specifications.
(2) mechanical and tool preparation
1) commonly used equipment square, supporting board, small hammer, chisel, steel blade, ink, ink knife, the level of scale, small line, line sinkers, pliers, steel line and
您可能关注的文档
- wget是一个十分常用命令行下载工具(WGet is a very common command line download tool).doc
- vc成员变量和static静态变量有什么区别(What is the difference between the VC member variable and the static static variable).doc
- vista系统c盘清理(vista系统c盘清理).doc
- win7瘦身减肥清理篇(Win7 weight loss clean-up articles).doc
- vi的各种尺寸(Various sizes of VI).doc
- win xp系统23招提速技巧(Win XP系统23招提速技巧).doc
- windows 7安装时有许多提示错误(There are a lot of tooltip errors when installing Windows 7).doc
- windows installer 服务无法启动(The Windows Installer service cannot start).doc
- win7游戏不兼容解决办法(Incompatible solutions for win7 games).doc
- vr教程(VR tutorial).doc
- 大脑的思维程序(Brain thinking process).doc
- 大芯板名称真假难辨(The name of the core board is difficult to distinguish between genuine and false).doc
- 大荣法则(Daiei law).doc
- 大硬盘补丁相关问题(Big hard disk patch issues).doc
- 大豆脂肪测定方法研究(Study on determination method of soybean fat).doc
- 大洋网 - 大洋书城 商品介绍 如何掌控你的一天24小时(The ocean web Bookstore describes how to control your day 24 hours).doc
- 大象与蚂蚁系列(Elephant and ant series).doc
- 大酒店工作总结(Summary of hotel work).doc
- 大富翁8隐藏人物和拼图(Millionaire 8 hidden characters and puzzles).doc
- 大班综合走进小学(Large class synthesis walk into elementary school).doc
文档评论(0)