装修的施工工艺(Decoration construction process).docVIP

装修的施工工艺(Decoration construction process).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
装修的施工工艺(Decoration construction process)

装修的施工工艺(Decoration construction process) Renovation of the construction process, electrical installation I. basic provisions 1., in strict accordance with electrical design drawings. (in case of construction and actual problems, the designer and the project manager will give the solution after construction on site) and after the completion of the project, the owner shall provide the owner with the complete drawings of the electrical works. 2. construction personnel should hold electrician certificate before they can enter the operation, and the construction electrician shall establish temporary construction electricity system at the beginning of the construction site. 3. construction may not damage anti-theft and intelligent management system device. Not allowed to shift in principle. 4., comply with the relevant provisions of property management, civilized construction, safety first. Two. Material acceptance. The 1. approach Dianliao, appliances must conform to the provisions of the contract, the main electrical appliances must have a product certificate. 2., a material for electrical access, must apply for acceptance, signing, for unqualified products, electricians have the right to propose replacement. Electrical material certificate, warranty, manual completion should be complete to the owners. Three. Shunt distribution 1., according to the design requirements, each households indoor electricity should be strictly shunt, the original distribution box depending on the number of design loop enough to decide whether to change or not. The 2. approach according to the diagram and the owners intend to establish the switch socket location, wiring to co-ordinate arrangements, wall pipe laying pipeline to slot into the wall must have cement mortar protective layer is greater than 1cm. 3. wire pipe and gas pipe, pipe spacing should be greater than 5cm, the parallel is not less than 10cm, the joint line between the tubes to use special connections, and special glue, fixed

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档