钻孔灌注桩基础主要质量问题分析及处理办法(Analysis and treatment of main quality problems of bored pile foundation).docVIP

钻孔灌注桩基础主要质量问题分析及处理办法(Analysis and treatment of main quality problems of bored pile foundation).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钻孔灌注桩基础主要质量问题分析及处理办法(Analysis and treatment of main quality problems of bored pile foundation)

钻孔灌注桩基础主要质量问题分析及处理办法(Analysis and treatment of main quality problems of bored pile foundation) Analysis and treatment of main quality problems of bored pile foundation Abstract: bored pile foundation is a covert project, there are many factors influencing the quality and, if not seize the key for effective prevention and control, it is possible to produce quality problem, even quality accidents, which have caused great impact on society and the construction of the enterprise itself. In this paper, the main quality problems of the bored pile foundation of transmission line are analyzed, and the main precautions and treatment methods are put forward for reference. Key words: bored pile; quality problems; analysis; prevention measures 0 Introduction Bored pile foundation is a basic form which can adapt to various geological conditions. It is also a basic form of widely used transmission lines, and the construction technology is relatively mature. The foundation is designed to direct holes in the designed pile, filled with pressure water in the well, and then placed in the hole reinforcement cage, pouring concrete through the pipe. The cast-in-place pile belongs to concealed works, the quality and effect of many factors, such as not to seize the key to effective prevention and control, it is possible to produce quality problem, even quality accidents, which have caused great impact on society and the construction of the enterprise itself. In this paper, the main quality problems of the bored pile foundation of transmission line are analyzed, and the main precautions and measures are put forward. 1 common construction quality problems and prevention during drilling 1.1 reinforcement cage floating problem 1.1.1 cause analysis: if the pipe is buried too deep in the concrete or the initial position of the steel cage is too high, the submerged pipe is poured out of the concrete, so that the concrete on the outer part of the pipe is raised as a whole. When the stirrup and con

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档