- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
铁路(Railway)
铁路(Railway)
I. individual choice questions
1. the length of ordinary sleepers in our country is ().
(A) 2.0m (B), 2.2m (C), 2.5m (D), 2.6m
The 2. is the gauge rail head tread (under) the minimum distance between the range of two side rails.
(A) (B) 14 mm, 15 mm and 16 mm (C) (D) 18 mm
3. Chinas railway mainly adopts () standard gauge.
(A) 1430mm (B), 1432mm (C), 1435mm (D), 1445mm
4. rail head total wear = vertical wear + () side wear.
(A) 1 (B), 1/2 (C), 1/3 (D), 1/4
5. the width of the pavement shall be the same as the width of the road, and the minimum shall not be less than ().
(A) 5m (B), 3M (C), 2.5m (D), 2m
6. crossing the road and railway should be orthogonal, have difficulty when the angle should be larger than the (general).
(A) 30 degrees (B), 40 degrees (C), 45 degrees (D), 60 degrees
7. formulas in common rail head seam line standard size
In a0= alpha L (tz-t0) + AG, TZ is found in terms of Tmax and Tmin, and Tmax and Tmin are local ().
(A) historical maximum and minimum temperatures (B), annual maximum and minimum temperatures;
(C) annual maximum and minimum rail temperature (D) annual maximum and minimum rail temperature;
8. the damage length of the concrete pillow shoulder is the length of the shoulder block.
(A) 1/3 above (B) 1/2 above (C) 1/4~1/3 (D) 1/3~1/2
In the 9.25m rail section, the rail temperature limit is changed when the rail is replaced or the rail is adjusted.
(A) (tz-20 DEG C) ~ (tz+20 DEG C) (B) (tz-25 DEG C) ~ (tz+25 DEG C)
(C) (tz-30 DEG C) ~ (tz+30 DEG C) (D) (tz-35 DEG C) ~ (tz+35 DEG C)
10. under any condition, the concrete pillow is laid at most per kilometre ().
(A) 1600 roots (B), 1760 roots (C), 1840 roots (D), 1920 roots
11. when the concrete joint is longitudinally split and the width of the corner of the shoulder is greater than (), it is invalid.
(A) 0.8mm (B), 1.0mm (C) 1.2, mm (D) 1.5, mm
12. insulation joint rail joint shall not be less than ().
(A) 18mm (B), 6mm (C), 5mm (D), 15mm
13. China Railway stipulates that the
您可能关注的文档
- 英语基础知识学习(Basic knowledge learning in English).doc
- 英语四级阅读理解练习含答案1(English level Four reading comprehension exercises include answer 1).doc
- 英语基础(English foundation).doc
- 英语字母(超好用、免费)(English alphabet (super easy to use, free of charge)).doc
- 英语学习42个经典秘诀(42 classic secrets of English learning).doc
- 英语学习大全(English study book).doc
- 英语学习小口令(Password for learning English).doc
- 英语学习并不可怕,自学你也行(English learning is not terrible. You can do it yourself).doc
- 英语学习方法总结(A summary of English learning methods).doc
- 英语复习txt(English review, TXT).doc
- 铝合金的牌号和成分对应表(Table 1 grade and composition of aluminium alloy).doc
- 铝合金常用资料(Common data for aluminum alloy).doc
- 铅笔的故事(The story of pencils).doc
- 银行从业资格(Banking qualification).doc
- 银行优质服务演讲稿(Bank quality service speech).doc
- 铝材质量(Aluminum quality).doc
- 银行卡利息(Bank card interest).doc
- 银行考试题(Bank examination questions).doc
- 银行间债券市场债券登记托管结算管理办法(Measures for the administration of bond registration, trusteeship and settlement of inter-bank bond markets).doc
- 销售与客户共舞(Sales dancing with customers).doc
文档评论(0)