- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电能计量(Electric energy measurement)
电能计量(Electric energy measurement)
Ningxia Guyuan area of the existing types of about 300000 users, most users are using low voltage electric energy metering device for collecting electricity. Because the partial low voltage three-phase energy metering device is not standardized in design, configuration, selection and construction, it affects the accuracy of measurement, and causes some economic losses to the power enterprises. Therefore, it is of great significance to analyze the cause of the error of the low voltage three-phase metering device and improve the configuration of the metering device. Taking some low voltage measuring points in Ningxia area of Guyuan as an example, the main causes of errors are analyzed and improvement measures are put forward.
1 errors due to meter configuration and misuse
1.1 the three-phase three wire two component watt hour meter is used to measure the active power of three-phase four wire system
The three-phase three wire electric energy meter can correctly measure the necessary condition is: Ia + Ib+ = Ic 0, used in three-phase three wire system the condition is strictly satisfied, so, no matter whether the load balanced three-phase two element power meter can correctly measure. The integrated low voltage distribution transformer unit is a three-phase four wire system. When the load distribution is balanced, the Ia + Ib+ Ic = 0 meets the requirements, and then the three-phase three wire energy meter will not produce errors. However, it is difficult to achieve the load balancing in the three-phase four wire system in the substation, especially the rural load, which is difficult to satisfy the zero sum of three-phase currents. If the three-phase two element energy meter is used in such a system, additional errors will be caused.
1.2 measurement error caused by unbalanced three-phase load
In the low-voltage three-phase four wire system, especially the export of low-voltage distribution transformer, although the use of the three compo
您可能关注的文档
- 内科答案解析5(Internal medicine answers 5).doc
- 内衣论文(Underwear paper).doc
- 内墙抹灰技术交底(Interior wall plastering technical disclosure).doc
- 内部控制十大漏洞(Ten major loopholes in internal control).doc
- 六年级语文快乐周末练习(阅读理解)(Six grade Chinese happy weekend practice (reading comprehension)).doc
- 法家学派(Legalist School).doc
- 法律体系与法律要素(Legal system and legal elements).doc
- 农大企业战略管理答案(Agricultural University enterprise strategic management answer).doc
- 法律小常识(Common sense of law).doc
- 法医病理学习题库(Forensic pathology learning question bank).doc
- 电脑上所有键的作用(The role of all keys on the computer).doc
- 电絮凝mbr组合工艺深度处理石化工业废水的研究(Study on advanced treatment of petrochemical industry wastewater by electro coagulation MBR combined process).doc
- 电脑主机和显示器都是功率多少(What is the power of the computer and the monitor).doc
- 电脑主板电容的作用(Function of computer mainboard capacitor).doc
- 电脑主机(Mainframe computer).doc
- 电脑保养与维护(Computer maintenance and maintenance).doc
- 电能质量的国标(GB GB power quality).doc
- 电脑做系统(Computer system).doc
- 电脑净化(Computer purification).doc
- 电脑剪切板知识(Computer clipboard knowledge).doc
最近下载
- 2023年资料员资格考试题库【轻巧夺冠】.docx
- 2025年河南省公务员录用考试《行测》真题及答案解析(回忆版).docx VIP
- 《项目经理的晋级之道——研发项目管理高级实战》.pptx VIP
- MJ-50数控车床液压系统设计.doc VIP
- 《超重问题与减重策略》课件.ppt VIP
- 贯彻新时代党的组织路线会议精神PPT模板.pptx VIP
- 水产动物营养与饲料 微量矿物元素营养 铁.pptx VIP
- 岭南版6年级美术 第1课《源远流长的古代美术》课件.pptx
- 学堂课程在线人工智能原理(北大)章节测试答案.docx
- 2024届高二物理第十二章《电能 能量守恒定律》测试题(含答案).docx VIP
原创力文档


文档评论(0)